Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00047
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 1900
Project NameUS BANK-19TH PHASE 2
Customer Number 
ePlanReview 
Description
(STOEL RIVES LLP - US BANK BLDG - 19TH, FLOOR PHASE 2) To replace 87 existing Standard Response to Quick Response sprinklers and add 15 new Q.R. sprinklers which is related to the expansion of an existing tenant located on this 19th floor, 11,626-ft/2 and on the 20th floor, 3,740-ft/2, into the 18th floor (11,627-ft/2). This work is Phase 2 of the 19th floor which is adding a water curtain around the open stairs to the 20th floor, adding Fire sprinklers to the soffited ceiling of the elevator lobby and replacement of the remaining standard response sprinklers. Phase 1 was permitted under FIR04-00759 (finaled 12/23/2004). This is a scope of work permit limited to what is specified in this description, relating to the plan dated 1/21/05. This building is fire sprinklered because it is a high-rise. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. This fire protection work shall comply with the IFC 2000 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD04-00029.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/20/20055/20/20055/20/2005PPASS
DetailsForrest France
Fire sprinkler finaled.
INSP-Final Inspection4/21/20054/22/20054/22/2005AFAIL
DetailsForrest France
Head overspaced in file and photocopy room. Provide fire caulk at penetration of line in riser room.
Issue permit  3/23/2005  
Plan resubmittals received  3/21/2005  
Sprinkler Plan Check3/21/2005 3/21/2005 PASS
DetailsBill Alexander
Plan revision
PLANS/APPL TAKEN TO FRONT DESK  3/21/2005 DONE
Inspection Record Card- Fire3/21/2005 3/21/2005 DONE
Permit Ready to Issue  3/21/2005 DONE
Telephone call  3/21/2005 DONE
lft vm with tom easton ###-#### that permit and fees are ready to be picked up
Telephone call  3/18/2005 DONE
called Tom ###-#### advised him plans failed he'll be in to get them///JRR
Sprinkler Plan Check3/3/2005 3/17/2005 FAIL
The water curtain changes do not meet requirements of NFPA 13-11.2.3.8.
Plan resubmittals received  3/3/2005  
Installation changes.
INSP-Sprinkler Rough-in2/4/20052/7/20052/7/2005APART
DetailsTroy Cobbley
karrie; Phone #: ###-#### Sprinklers under the stairs are ok to cover but will require submittal to show additional work. No more covers to be given unless the work is shown. 2/7/2005 10:04:38 AM
INSP-Sprinkler Rough-in/Hydro1/31/20052/1/20052/1/2005APART
DetailsRick Jackson
###-#### Tom Lobby only okay to cover 2/1/2005 7:46:49 AM
Issue and Print Permit  1/31/2005 DONE
Sprinkler Plan Check1/25/2005 1/28/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/28/2005 DONE
Permit Ready to Issue  1/28/2005 DONE
Inspection Record Card- Fire1/28/2005 1/28/2005 DONE
Telephone call  1/28/2005 DONE
called Tom ###-#### left a msg on his voice mail permit is ready & fees
Application received  1/25/2005  
Plan assigned to (Bill)1/25/2005 1/25/2005 DONE
Plan assigned to (Bill)3/3/2005    
DetailsBill Alexander