Permit Information
Permit NumberFIR05-00069
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 9465 W EMERALD
Project NameSPR VIDEO EYE - #100 & 200
Customer Number 
ePlanReview 
Description
VIDEO EYE - SUITES 100 & 200 * To add and relocate fire sprinklers from an existing 37,750 shell building system, for the construction of a new tenant space, occupying 11,249-ft/2 warehouse & production area space on the first and 7,513-ft/2 of office on second floors of an. The fire sprinkler work is associated with the construction of restrooms, partitions and suspended ceiling system. This building is fully fire sprinklered. The shell permit was installed under FIR04-00258 connected to building permit BLD04-00300. This fire protection work shall comply with the IFC 2000 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD04-01513.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/15/20057/15/20057/15/2005PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro6/24/20056/27/20056/27/2005PPART
DetailsForrest France
Overhead rough-in is good for cover, need all escutcheons on before final.
INSP-Sprinkler Rough-in6/21/20056/21/20056/21/2005PFAIL
DetailsForrest France
Provide hanger at 2nd floor arm over greater than 2' in length, add head 2nd floor as shown on plans beyond tenant demising wall.
Issue and Print Permit  6/20/2005 DONE
(F) Reprint permit  6/20/2005 DONE
Sprinkler Plan Check6/1/2005 6/17/2005 PASS
DetailsBill Alexander
06/17/2005-Provided calrifications.

EMAIL to Matt Kahns-6/6/2005 (no response)
6/9/2005
1. Relating to the above project are the Tyco Series TY-FRB EC HSW submittals that is not addressed on the plan sprinkler head legends? Is this the added head installed under a stairs?
Is this the only head?

2. The "Skylight" protection appears to be inadequate. The skylights are over 32-ft/2 and shall have correct sprinkler protection. The position of the deflector shall meet requirements of 8.5 "Position, Location, Spacing, and Use of Sprinklers." Inspector will verify deflector position in each.
Plan assigned to (Bill)6/1/2005 6/17/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/17/2005 DONE
Permit Ready to Issue  6/17/2005  
Inspection Record Card- Fire6/17/2005 6/17/2005 DONE
Telephone call  6/17/2005 DONE
left mess that permit is ready
Telephone call  6/17/2005 DONE
will pickup later
Miscellaneous action  6/9/2005 DONE
Returned failed modified plans to permit desk for returning
Telephone call  6/9/2005 DONE
lft vm for matthew kahns ###-#### that permit failed and needed to be picked up
Plan resubmittals received  6/1/2005 DONE
DetailsBill Alexander
Miscellaneous action  5/4/2005 DONE
Recieved documentation of changes in the field which require covering. Modifications will follow with resubmittal plan prior to permit final. Documents attached to permit.
Plan resubmittals received  5/3/2005 DONE
INSP-Sprinkler Rough-in/Hydro2/24/20052/24/20052/24/2005PPART
DetailsTroy Cobbley
See approved plans for locations of piping above hard lids ok to cover. 2/24/2005 3:37:24 PM
Issue permit  2/22/2005 DONE
Inspection Record Card- Fire2/16/2005 2/16/2005 DONE
Permit Ready to Issue  2/16/2005 DONE
Telephone call  2/16/2005 DONE
lft message with receptionist that permit and fees are ready to be picked up for matt kahns
Sprinkler Plan Check2/14/2005 2/15/2005 PASS
DetailsBill Alexander
Plan assigned to (Bill)2/14/2005 2/15/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/15/2005 DONE
Plan resubmittals received  2/14/2005 DONE
Issue and Print Permit  2/11/2005 DONE
Plan assigned to (Bill)2/3/2005 2/10/2005 DONE
Sprinkler Plan Check2/3/2005 2/10/2005 PART
DetailsBill Alexander
Allowed work on the 2nd floor only (with corrections also).
1. The first floor (FP1 of 2) spacing of sprinklers exceeds 130-ft/2 as originally designed in many areas that would be designated OH Occupancy areas. Some of these areas found (but may not be limited to) are, Assembly #104, Demo #101, Demo #102, Finish Product Storage #103, and an area not identified but extends from the Assembly #104.

2. Address (detail) the hanger attachments (FP1 and FP2 of 2), which must be listed and/or specifically addressed in NFPA 13 Chapter 9.

3. Plan FP2 of 2. Provide information and corrections "open office" skylight and correct rerouting pipe sizes to match origignal design.
PLANS/APPL TAKEN TO FRONT DESK  2/10/2005 DONE
Permit Ready to Issue  2/10/2005 DONE
Inspection Record Card- Fire2/10/2005 2/10/2005 DONE
Telephone call  2/10/2005 DONE
Spoke with Alicia told her that permit is ready & fees///2/10/05 BAS
Application received  2/3/2005