INSP-Final Inspection | 3/10/2006 | 3/13/2006 | 3/13/2006 | A | PASS |
Forrest France
|
|
|
Required items on the correction notice have been completed, shell and core fire alarm permit finaled.
|
INSP-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | FAIL |
Forrest France
|
|
|
Need to post building map showing roof plan including clock tower, update plans and 1st floor map to show changed EOL location from device 8:8.
|
INSP-Alarm Testing | 11/22/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Forrest France
|
|
|
The north elevator alarm devices tested okay.
|
INSP-Alarm Testing | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | CANC |
Forrest France
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/22/2005 | | DONE |
|
|
|
already pd previously
|
Permit Ready to Issue | | | 11/21/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/21/2005 | | 11/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2005 | | |
|
|
|
Called & told Kurt permit was ready to pick up on 11-21-05 @ 2:57 CW
|
Plan resubmittals received | | | 11/18/2005 | | DONE |
|
|
|
Nick with Synergy brought revised sheets to place in the submittals.
|
Alarm Plan Check | | | 11/18/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 11/17/2005 | | FAIL |
|
|
|
Resubmittal required. No comments written, spoke to Nick at Synergy.
The FSD as shown in elevator #3 does not exist. It is still included on the plans.
A single tamper switch is shown for the fire pump items, etc. Nick will up date these at the same time and bring in new sheets to insert into the existing submittal.
|
INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
|
INSP-Alarm Testing | 11/9/2005 | 11/9/2005 | 11/9/2005 | P | PART |
Forrest France
|
|
|
The north elevator remains to be completed and tested, final pending verification of resubmittals for field changes.
|
Plan resubmittals received | | | 11/3/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | PART |
Forrest France
|
|
|
North elevator is still non-functional, provide resubmittals for all required changes.
|
INSP-Alarm Testing | 10/24/2005 | 10/25/2005 | 10/25/2005 | P | FAIL |
Forrest France
|
|
|
North elevator is not functional at this time, need an additional SD above the FACP due to a beam pocket obstruction, clock tower AV is not functional, provide signage at FACP room door, outside bell to be relocated at face of brick, elevator roof damper is not required due to barometric shaft, resubmitt for changed EOL, added devices, deleted damper and revised matrix for pump, provide audibility for the FACP room.
|
INSP-Alarm Testing | 10/24/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Forrest France
|
|
|
Partial shell alarm inspection only.
|
INSP-Alarm Testing | 10/21/2005 | 10/21/2005 | 10/21/2005 | P | FAIL |
Forrest France
|
|
|
Lower pull station to 48" AFF, provide additional smoke at the panel due to beam blockage, verify audibility in the FACP room, fire pump run shows as an alarm and the matrix indicates a supervisory, change label at roof tamper and stair flow 108, outside bell shall silence upon waterflow ceasation, all sprinkler alarms tested today, no other items tested at this time.
|
Alarm Plan Check | | | 10/14/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/14/2005 | | 10/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/14/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 10/14/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/6/2005 | | DONE |
|
|
|
Nick Schafer (Synergy) red-lined riser for changes.
|
Plan resubmittals received | | | 9/29/2005 | | |
|
|
|
|
Alarm Plan Check | | | 9/26/2005 | | FAIL |
|
|
|
NO comments written. Elevator requires two firemans hat and a revised matrix is required.
|
Plan resubmittals received | | | 9/16/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/12/2005 | | FAIL |
|
|
|
Resubmittal required. Nick Schafer (Synergy) stated he needed to add input for a fire pump. I explained to him that he also needed to change his design to horn/strobe notification in all areas except the theatre. (Apparently the theatre is "isolated" from the rest of the building.)
|
Plan assigned to (Mary) | 9/12/2005 | | 9/12/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/26/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 8/12/2005 | | DONE |
|
|
|
NOTE to PDS Fire Inspector. The elevators in BODO 7 are missing the required smoke detector at the top of the shaft (per Idaho Elevator Inspector), I am working with the engineer to get thei issue resolved. I don't believe it will pass the elevator inspection, but if it does, please do NOT final this permit until we have this issue resolved. THANKS
|
Plan assigned to (Mary) | 2/9/2005 | | 4/12/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/12/2005 | | 4/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2005 | | DONE |
|
|
|
tlk to kurt lechtenberg ###-#### that permit and no fee
|
CHANGE STATUS TO (ISS) | | | 4/12/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/12/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/12/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Plan resubmittals received | | | 4/4/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 3/14/2005 | | DONE |
|
|
|
PLANS ON HOLD pending additional information. ELevator has been defined as a traction elevator with the equipment in the pit and cables to the top. The FA plans are incorrect as there is no machine room. Nick at Synergy is working on getting additional information from the sprinkler contractor.
|
Plan resubmittals received | | | 3/7/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/23/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Kurt Lechtenberg 2/23.
|
Application received | | | 2/9/2005 | | |
|
|
|
|
Case Summary | | | 2/9/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/21/2005 | | | | |
|
|
|
|