Permit Information
Permit NumberFIR05-00089
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 850 W BROAD ST
Project NameBODO BLDG #4 - SPR OH
Customer Number 
ePlanReview 
Description
BODO - BUILDING #4 (SHELL & CORE) - To install a complete wet system fire sprinkler system (OH-2) in a new 52,260-ft/2, two story, noncombustible shell and core building for future office, retail and restaurant tenants. This work also includes the installation of a Class 1 Standpipe system in a two-hour fire-resistive, noncombustible, four story stair enclosure to be used as the second exit from the new building and required exiting for the four story Foster Building. NOTE: Two-hour fire walls will separate these buildings from each other, because of allowable area and construction types. The fire sprinkler system is being used for area increase. All fire sprinkler and standpipe work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-01323. This is a shell and core permit only. Separate tenant improvement permits are required to finish this building for occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/13/200512/16/200512/16/2005APASS
DetailsForrest France
Fire sprinkler passed final inspection, defficient items have been completed.
INSP-Supply line flush10/28/200511/1/200511/1/2005PPASS
DetailsForrest France
Fire sprinkler shell work passed inspection.
INSP-Final Inspection10/28/200510/28/200510/28/2005PPART
DetailsForrest France
Temporary approval given with Dave Hanneman"s permission pending flow test at roof standpipe, 2nd floor restroom walls, tenant demising walls.
INSP-Sprinkler Rough-in/Hydro10/25/200510/26/200510/26/2005AFAIL
DetailsForrest France
Three items remain not completed on correction notice including to verify required flow/pressure at the roof standpipe (500gpm @ 100psi see note #35), area above the restrooms 2nd floor is lacking full sprinkler coverage-full height wall must be completed or provide uprights above this space, tenant demising walls for future tenants have disrupted shell sprinkler coverage in several areas.
INSP-Sprinkler Rough-in/Hydro10/25/200510/25/200510/25/2005PNR
DetailsForrest France
Contractor states all items on correction notice are complete (subject to verification by inspector) except 3 items, no re-inspection performed at this time.
INSP-Sprinkler Rough-in/Hydro10/21/200510/24/200510/24/2005AFAIL
DetailsForrest France
A 13 item correction list was discussed and left with Brian of DeBest sprinkler for the shell rough-in.
INSP-Sprinkler Rough-in/Hydro10/21/200510/21/200510/21/2005PNR
DetailsForrest France
Cancel inspection per conversation with Brian.
INSP-Final Inspection10/20/200510/20/200510/20/2005PFAIL
DetailsForrest France
PIV tamper is not adjusted correctly, the flow switch operates intermittently causing the outside bell to cycle on and off, no overhead looked at today due to time constraints.
INSP-Final Inspection10/19/200510/21/200510/20/2005ACANC
DetailsForrest France
contact brian calkins.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Final Inspection10/13/200510/14/200510/14/2005AFAIL
DetailsForrest France
Alarms not completed for final, need to cut heads in drop ceiling area north exit corridor, cert. backflow preventers, sign and fill antifreeze system, eq FDC, perform forward flow test, provide sign at standpipe and flow test see note #29 and 30 on plan review, exterior wall needs to be built at riser for WPI, drain and FDC, install outside bell, this is not a comprehensive or all inclusive list of remaining items.
INSP-Sprinkler Rough-in/Hydro10/12/200510/13/200510/13/2005APART
DetailsForrest France
Aboveground hydrostatic test for the shell permit passed inspection.
INSP-Sprinkler Rough-in/Hydro10/10/200510/11/200510/11/2005PCANC
DetailsTroy Cobbley
No hydro test done. Water has not been put in system yet.
INSP-Sprinkler Rough-in10/10/200510/11/200510/11/2005APART
DetailsTroy Cobbley
I looked at the noted problems and they have been corrected. Temporary pendant heads have been installed in the west elevator lobby until the ceiling has been installed. First floor service corridor and the second floor service corridor are ok for cover.
INSP-Sprinkler Rough-in/Hydro9/22/20059/22/20059/22/2005PCANC
DetailsForrest France
Wrong permit called in, this inspection was for tenant P.F. Chang's FIR05-00378, not the core and shell.
INSP-Sprinkler Rough-in9/16/20059/16/20059/16/2005AFAIL
DetailsForrest France
See approved plans for annotations of defficient areas, this inspection was called in under the wrong permit number fir05-00297 for the adjacent 4 story Foster building.
INSP-Sprinkler Rough-in8/26/20058/30/20058/29/2005ACANC
DetailsUnknown
Contact: Jim - Rough in; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in7/18/20057/19/20057/19/2005APART
DetailsForrest France
Shell rough-in satisfactory for first floor SE corner future tenant space as initialed on approved plans.
INSP-Sprinkler Rough-in7/18/20057/18/20057/18/2005PFAIL
DetailsForrest France
Contractor could not produce approved plans for review on site. Noted some deficiencies including missing EQ bracing, missing retaining straps, and sprig-ups with ssu heads in the pendent position.
Plan assigned to (Bill)2/14/2005 4/4/2005 DONE
Sprinkler Plan Check3/23/2005 4/4/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/4/2005 DONE
Inspection Record Card- Fire4/4/2005 4/4/2005 DONE
Permit Ready to Issue  4/4/2005 DONE
Telephone call  4/4/2005 DONE
lft message with receptionist ###-#### that permit and fees areready to be picked up
Issue permit  4/4/2005  
Plan resubmittals received  3/23/2005  
Sprinkler Plan Check2/14/2005 2/17/2005 FAIL
DetailsBill Alexander
1. Plan sheets FP1 and 2 of 2. Several areas have fire sprinklers installed with different orifice/k-factors that are not consistent with the design verified? Provide plans that are consistent with the design verified and resubmit. (BMC 7-01-50-901.2, IFC 105.4.2)

2. Unless approved otherwise by the code official, sprinkler systems in any building 2 or more levels in height shall be separated by floor control assemblies in addition to main control and alarm features. Floor control assembly components shall include, but may not be limited to, properly placed and installed control valve, alarming device, test and drain assembly, and pressure gage. Provide floor control assemblies and resubmit. (BMC 7-01-55-903.1.5)

3. Provide fire sprinkler protection at the top of the required four story stair enclosure servicing the "Foster Building". (BMC 7-01-50-901.2, IFC 105.4.2, NFPA 13-8.14.3.2.1)

4. BoDo #4, four story stair enclosure is a required exit for the "Foster Building." Submit a Class 1 Standpipe System, with correct detail, to verify minimum installation code compliance per NFPA 14. (IFC 905.3.1.1, BMC 7-01-50-901.2, IFC 105.4.2)

5. Several areas designed have pipe sizes that do not match the system design verified. Provide sprinkler designed piping which incorporate and meet the design/s verified (no exceptions allowed). (BMC 7-01-50-901.2, IFC 105.4.2)

6. If installing trapeze hangers, provide on the plans the engineered trapezes hanger support information details, locations and types identified within this facility. Engineering shall include span, weight/load factors, restraints, hanger sizes, rod sizes and related appurtenance as detailed in NFPA 13-9.1.1.6.1 and required per NFPA 13-14.1.339). NOTE: Providing a "typical" trapeze, which does not clearly address correct engineering for the dissimilar spans and loads supporting will require resubmittal design corrections. (BMC 7-01-50-901.2, IFC 105.4.2, NFPA 13-14.1.3[39])

7. Temperature rating of all sprinklers in machine rooms and elevator pits shall be coordination with the required elevator shunt/trip operation/installation per NFPA 72. Where heat detectors are used to shut down elevator power prior to sprinkler operation, the detector shall have both a lower temperature rating and a higher sensitivity as compared to the sprinkler. Revise and address the temperature rating of these heads in these locations and indicate it by a note on the plan for the field installer. (NFPA 72:6.15.4.1*, 13-A.8.14.5.3)

NOTE: One set of plans is bundled incorrectly and was not accepted.
Miscellaneous action  2/17/2005 DONE
Returned failed plan to permit desk for returning and corrections
Application received  2/14/2005  
INSP-Sprinkler Rough-in/Hydro8/12/20058/15/2005 A 
DetailsUnknown
Contact: Brian; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro8/10/20058/12/2005 A 
DetailsUnknown
contact: Brian - Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley