INSP-Final Inspection | 7/26/2005 | 7/29/2005 | 7/29/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinklers finaled. Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Troy Cobbley
|
|
|
Piping is ok to cover. 3/30/2005 3:27:33 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Troy Cobbley
|
|
|
Sprinkler roughin passed. Tenting failed. There are three areas that need insulation modification. Jim Danes to fix and call back in 3/29/2005 12:29:21 PM
|
Issue permit | | | 3/28/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 3/17/2005 | | 3/25/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/17/2005 | | 3/25/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/25/2005 | | 3/25/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2005 | | DONE |
|
|
|
lft ms with receptionist ###-#### that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 3/17/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 3/11/2005 | 3/14/2005 | 3/14/2005 | A | FAIL |
Troy Cobbley
|
|
|
Pipe routing has changed and there are alot of added heads. Resubmit plans showing changes and also contractor needs to address the items Bill wanted resubmitted as referenced in the review comments. 3/14/2005 8:48:56 AM
|
Inspection Record Card- Fire | 2/18/2005 | | 2/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/18/2005 | | 2/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/18/2005 | | DONE |
|
|
|
lft vm with debest ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 2/18/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/15/2005 | | 2/17/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/15/2005 | | 2/17/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2005 | | DONE |
|
|
|
|
Application received | | | 2/15/2005 | | |
|
|
|
|