Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00091
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 7365 N PIERCE PARK LN
Project NameSPR SCHMITT RESIDENCE
Customer Number 
ePlanReview 
Description
WAYNE SWANSON CONSTRUCTION - SCHMITT RESIDENCE * To install an NFPA 13D Modified fire sprinkler system in a new 3062-ft/2 one story single family dwelling with a 1571-ft/2 attached, below grade four car garage/mechanical room. This system shall be equipped with an alarm initiating device, commonly referred to as a flow switch, that is connected to a audible outside alarm. All fire sprinkler work and related, which includes dual use, single service water supply, the system backflow prevention device (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD04-01756.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/26/20057/29/20057/29/2005APASS
DetailsTroy Cobbley
Fire sprinklers finaled. Underground flush passed.
INSP-Sprinkler Rough-in/Hydro3/30/20053/31/20053/31/2005APASS
DetailsTroy Cobbley
Piping is ok to cover. 3/30/2005 3:27:33 PM
INSP-Sprinkler Rough-in/Hydro3/28/20053/29/20053/29/2005APART
DetailsTroy Cobbley
Sprinkler roughin passed. Tenting failed. There are three areas that need insulation modification. Jim Danes to fix and call back in 3/29/2005 12:29:21 PM
Issue permit  3/28/2005  
Plan assigned to (Bill)3/17/2005 3/25/2005 DONE
Sprinkler Plan Check3/17/2005 3/25/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/25/2005 DONE
Inspection Record Card- Fire3/25/2005 3/25/2005 DONE
Issue and Print Permit  3/25/2005 DONE
Permit Ready to Issue  3/25/2005 DONE
Telephone call  3/25/2005 DONE
lft ms with receptionist ###-#### that permit and fees are ready to be picked up
Plan resubmittals received  3/17/2005  
INSP-Sprinkler Rough-in3/11/20053/14/20053/14/2005AFAIL
DetailsTroy Cobbley
Pipe routing has changed and there are alot of added heads. Resubmit plans showing changes and also contractor needs to address the items Bill wanted resubmitted as referenced in the review comments. 3/14/2005 8:48:56 AM
Inspection Record Card- Fire2/18/2005 2/18/2005 DONE
Inspection Record Card- Fire2/18/2005 2/18/2005 DONE
Permit Ready to Issue  2/18/2005 DONE
Telephone call  2/18/2005 DONE
lft vm with debest ###-#### that permit and fees are ready to be picked up
Issue and Print Permit  2/18/2005 DONE
Plan assigned to (Bill)2/15/2005 2/17/2005 DONE
Sprinkler Plan Check2/15/2005 2/17/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  2/17/2005 DONE
Application received  2/15/2005