Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00092
StatusFinaled
Name MICRON TECHNOLOGY INC FA
Site Address 8000 S FEDERAL WAY
Project Namealm - MIC #32/33T
Customer Number8123
ePlanReview 
Description
To provide total notification in the remodeled room in building 32. It appears the calcs (battery and voltage drop) have sufficient capacity. No comments have been written, PDS Fire Inspector to field verify.

BLD05-00314 for Micron Building #32 - New Office Configuration (2005-8123) - To demo and remove the east partition wall of Conference Room #112B, the double door between Open Office #112D and Hallway #100P and the door between Open Office #112Cand Hallway #100P. To construct approximately 18 lineal feet of new partition wall and a new entry door from Hallway #100P to create two new approximate 110 square foot office spaces at the old Conference Room #112B location. This also includes suspended ceiling and lighting modifications associated with the room remodel. This work is located on the first floor of building #32 between grid lines #4 and #D&#E. This permit is also for the construction of approximately 12 lineal feet of partition wall to divide the existing Training Room #102X into two approximate 105 square foot office spaces, Offices #102AX and 102X. The entry door is being removed from between Document Control #112F and Hallway #100P and being reinstalled as the entry door for Office #102AX. This also includes suspended ceiling and lighting modifications associated with this remodel. This work is being done on the first floor of Building #32 between grid lines #B&#C and #10 . This permit also covers the installation of approximately 30 lineal feet of partition walls and two interior doors to create two new offices at the southeast corner of trailer #33T, Offices #101D and 101E. This also includes suspended ceiling and lighting modifications associated with the creation of these two new office spaces. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/28/20056/29/20056/29/2005PPASS
DetailsTroy Cobbley
Fire alarm finaled
Plan assigned to (Mary)2/15/2005 3/3/2005 DONE
Alarm Plan Check  3/3/2005 PASS
Approved pending PDS Fire Inspector field verification. No comments written.
PLANS/APPL TAKEN TO FRONT DESK  3/3/2005 DONE
Permit Ready to Issue  3/3/2005 DONE
Telephone call  3/3/2005  
E-amiled Paul & Max that permit is ready & fees///3/3/05 10:40am BAS
Inspection Record Card- Fire3/3/2005 3/3/2005 DONE
Issue and Print Permit  3/3/2005 DONE
Application received  2/15/2005