INSP-Final Inspection | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
DOC - Permit Finaled | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/11/2005 2:59:26 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2005 | 3/2/2005 | 3/2/2005 | P | PASS |
Troy Cobbley
|
|
|
Retaining straps added. 3/2/2005 4:50:39 PM
|
INSP-Sprinkler Rough-in | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Troy Cobbley
|
|
|
Sprinkler rough-in is ok and piping can be covered but retaining straps need to be added to the existing hangers with-in the scope of work. Looks like maybe nine are needed. 2/25/2005 3:42:02 PM
|
Plan assigned to (Bill) | 2/16/2005 | | 2/24/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/17/2005 | | 2/24/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/24/2005 | | 2/24/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2005 | | DONE |
|
|
|
called to let TVFP know fees permit is ready
|
Issue and Print Permit | | | 2/24/2005 | | DONE |
|
|
|
|
Application received | | | 2/16/2005 | | |
|
|
|
|