Permit NumberFIR05-00104
StatusFinaled
Name E2CO
Site Address 1426 S ENTERTAINMENT AVE
Project NameOxford Suites Hotel
Customer Number 
ePlanReview 
Description
To provide a required manual fire alarm system that includes sprinkler monitoring, required automatic detection, elevator recall/shutdown, HVAC shutdown, fire/smoke damper control, door release, cooking hood monitoring and notification throughout.

4/4/2006 - See comments #24, 30 and 31.

The associated building permit (BLD 04-00640) is to construct a new 91,785 sq.ft. four story, with a basement, 132 room suite hotel. The basement is 17,287 sq.ft. and contains, conference rooms, lounge, full service restaurant with kitchen. The first floor is 21,164 sq.ft. contains the indoor swimming pool, spa, lobby area and 30 guest room. The second floor is 20.084 sq.ft. contains 32 suites the third floor is 21,164 sq.ft. contains 39 suites and the forth floor is 17,287 sq.ft. contains 31 suites. NOTE: This building is fully fire sprinklered for area increase. Separate permits are required to be obtained for the indoor pool and spa. All construction per the approved plans and attached comment list. Refer to BLD 04-01157 for Grading Permit. MJP DRH03-00148 CUP03-00068 PC#161-04 Oxford Suites Hotel *
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/12/20064/13/20064/13/2006APASS
DetailsTroy Cobbley
Fire alarm permit finaled
CHANGE STATUS TO (ISS)  4/12/2006 DONE
already issued & printed previously
Alarm Plan Check  4/4/2006 PASS
Plan Modification. Approved pending PDS Fire Inspector field verification.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2006 DONE
Inspection Record Card- Fire4/4/2006 4/4/2006 DONE
Telephone call  4/4/2006 DONE
called ###-#### and left message for Jon that permit is ready and fee
Permit Ready to Issue  4/4/2006 DONE
Plan resubmittals received  3/15/2006  
Miscellaneous action  2/16/2006 DONE
Sent revised meeting comments back to E2 Co. for distribution.
Alarm Plan Check  2/3/2006 FAIL
resubmittal required. Meeting with Jon Van Stone (E2 Co) to discuss teh FA modifications and builidng changes. This FA permit will NOT be issued until the building modifications to the elevator are accepted by the Boise Building Dept.
INSP-Final Inspection1/20/20061/20/20061/20/2006PPART
DetailsForrest France
The correct back boxes have been installed in the pool area, the elevator has been state inspected and approved. Per S. Rogers a temp. occupancy was given pending field inspection of approved resubmitted plans and verification the correct sample tubes have been installed in the duct detectors.
INSP-Alarm Testing1/19/20061/19/20061/19/2006PFAIL
DetailsTroy Cobbley
Need to install weather proof backboxes in the pool area and provide correct sample tubes lenghts in the duct smoke detectors. Still waiting on approved resubmitted plans for the fire alarm. Per Sam Rogers a temporary occupancy can be given if the elevators get signed off by the state elevator inspectors.
INSP-Alarm Testing1/18/20061/18/20061/18/2006PFAIL
DetailsTroy Cobbley
Strobes do not sync, duct detectors are mounted incorrectly, need verification of weatherproof devices in the pool area, missing door hold open on first floor north stair door and a/v's are not within 15' of the ends of the corridor on the first floor on both sides of the lobby
INSP-Alarm Testing1/13/20061/13/20061/13/2006APASS
DetailsTroy Cobbley
Elevator recall passed. First floor smoke detectors passed.
INSP-Alarm Testing1/12/20061/12/20061/12/2006PPASS
DetailsTroy Cobbley
2nd floor testing passed.
INSP-Alarm Testing1/11/20061/11/20061/11/2006ADONE
DetailsTroy Cobbley
Dry system, fourth and third floors have passed. Matt is to change the programming for the dampers to only reset when the panel is reset and not on silence.
INSP-Alarm Testing1/10/20061/10/20061/10/2006APART
DetailsTroy Cobbley
Today we tested the fire alarm panel itself and the interconnections between it and the NAC panels. We also tested were the smoke detectors over the panels. Also tested was the wet system tamper switches and flow switches for all floors. I found one duct smoke detector that needs relocated and the north fourth floor manual pull did not work.
Plan resubmittals received  1/10/2006 DONE
INSP-Alarm Testing1/9/20061/9/20061/9/2006PCANC
DetailsTroy Cobbley
Contractor has not lowered the manual pull stations that are mounted too high. No test performed.
FIR-Aging Inspection6/17/20056/17/20056/17/2005 NR
DetailsForrest France
Permit has been recently issued, work is ongoing.
Plan assigned to (Mary)2/22/2005 3/18/2005 DONE
Inspection Record Card- Fire3/18/2005 3/18/2005 DONE
Alarm Plan Check  3/18/2005 PASS
Approved pending PDS Fire Inspector field verification.
PLANS/APPL TAKEN TO FRONT DESK  3/18/2005 DONE
Permit Ready to Issue  3/18/2005  
Telephone call  3/18/2005 DONE
Spoke with Jon and told him that permit is ready & no fees due///3/18/05 11:57am BAS
Issue and Print Permit  3/18/2005 DONE
Plan resubmittals received  3/11/2005  
Alarm Plan Check  3/4/2005 FAIL
Resubmittal required. Faxed Comments to Jon Van Stone E2CO.
Application received  2/22/2005  
Case Summary  2/22/2005 DONE