INSP-Final Inspection | 3/30/2011 | 3/31/2011 | 3/31/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 2/4/2011 | 2/4/2011 | 2/9/2011 | | NR |
Troy Cobbley
|
|
|
I deferred this project to Jerry McAdams for follow up.
|
INSP-Conference | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over the outstanding issues as per the permit history with Keith at ADT.
|
INSP-Conference | 6/15/2010 | 6/29/2010 | 7/2/2010 | A | DONE |
Troy Cobbley
|
|
|
I left a message on mikes voice mail requesting job status.
|
FIR-Aging Inspection | 6/11/2010 | 6/11/2010 | 6/15/2010 | | NR |
Troy Cobbley
|
|
|
I spoke to Mike with Action Couriers about getting this inspection completed. He wanted to know if Northwest Security could complete this permit instead of ADT. I let him know that a separate permit would be required if another company completed the work. He was going to follow up with ADT. A follow up conference has been set up.
|
INSP-Final Inspection | 5/11/2005 | 5/12/2005 | 5/12/2005 | A | FAIL |
Troy Cobbley
|
|
|
The zone #1 smoke detectors located in the storage room are not connected to the fire alarm system. Provide knox key box per review comments. Provide faxed verification of the signals.
|
Telephone call | | | 5/3/2005 | | DONE |
|
|
|
customer picked up plans from adt
|
CHANGE STATUS TO (ISS) | | | 5/3/2005 | | DONE |
|
|
|
picked up plans
|
Alarm Plan Check | | | 4/28/2005 | | PASS |
|
|
|
Plan Modification. Approved pending PDS Fire Inspector field verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/28/2005 | | DONE |
|
|
|
tlk to dave whiting ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 4/28/2005 | | 4/28/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/26/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 2/24/2005 | | 3/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/15/2005 | | DONE |
|
|
|
Request for voltage drop calculations
|
Plan resubmittals received | | | 3/15/2005 | | DONE |
|
|
|
Received VD calcs via fax.
|
Alarm Plan Check | | | 3/15/2005 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/15/2005 | | 3/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/15/2005 | | DONE |
|
|
|
Spoke with Dave and told him that permit is ready & fees///3/15/05 12:40pm BAS
|
Issue and Print Permit | | | 3/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2005 | | DONE |
|
|
|
Question to Dave at ADT regarding the office spaces for BMC (3) and Metro Movers regarding notification. No sprinkler system exists, therefore the IBC occupancy separation would be required and apparently there is only the typical 1 hour demising wall. Dave will notify the owner and let me know the route he would like to take around Thursday or Friday.
|
Application received | | | 2/24/2005 | | |
|
|
|
|
INSP-Conference | 7/2/2010 | 7/7/2010 | | A | |
Troy Cobbley
|
|
|
Follow up conference with Mike; ###-####
|