INSP-Final Inspection | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
Sprinkler Plan Check | 5/10/2005 | | 5/19/2005 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 5/10/2005 | | 5/19/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2005 | | DONE |
|
|
|
|
Issue permit | | | 5/19/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/17/2005 | 5/18/2005 | 5/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final
|
Plan resubmittals received | | | 5/10/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PART |
Troy Cobbley
|
|
|
Above ground hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | CANC |
Troy Cobbley
|
|
|
The fdc wasn't included in the hydro test. Mike said he would change that and call it in for tomorrow
|
INSP-Sprinkler Rough-in | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PART |
Troy Cobbley
|
|
|
Office area is ok to cover. Resubmittals needed for sprinklers added under both the stairs. Final spacing of pendants in office will be checked when walls are built.
|
Issue and Print Permit | | | 4/19/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 4/6/2005 | | 4/18/2005 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 4/6/2005 | | 4/18/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/18/2005 | | 4/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2005 | | DONE |
|
|
|
tlk to trent Bice that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 4/6/2005 | | |
|
|
|
|
Application DENIED | | | 3/14/2005 | | DONE |
|
|
|
per Bill plan failed
|
Plan assigned to (Bill) | 2/25/2005 | | 3/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/25/2005 | | 3/3/2005 | | FAIL |
Bill Alexander
|
|
|
1. IBC Building review has failed and no IFC fire review has been approved with the building permit to which this fire permit is attached. Resubmit when building IFC review has been completed so a correct IFC fire sprinkler plan review can be accomplished in the High Piled Combustible facility.
2. Designer did not provide expansion chamber information (data submittals).
3. Designer does not address hanger limit/requirements for connection of hangers to TJI's under the mezzanine. Depending on the manufacturer, hanger attachments must meet installation listing which are not addressed in NFPA 13 Chapter 9.
4. Plans are incomplete which do affect the system installation requirements relating to review process meeting minimum code. No construction information, sectional cuts or details provided for the added storage canopy.
NOTE: Other IFC building requirements may be required with High Piled Combustible Storage which will be addressed as soon as the Building Permit has been verified and approved.
|
Miscellaneous action | | | 3/3/2005 | | DONE |
|
|
|
Took failed documents to permit desk for calling and returning.
|
Telephone call | | | 3/3/2005 | | DONE |
|
|
|
tlk to trent bice ###-#### that his permit failed and ready to be picked up
|
Application received | | | 2/25/2005 | | |
|
|
|
|