INSP-Final Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PASS |
Forrest France
|
|
|
Fire alarm passed inspection, permit not "doc" finaled as previous inspection request was for alarm testing not final inspection.
|
INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 | P | PART |
Troy Cobbley
|
|
|
Permit previously finled
|
INSP-Alarm Testing | 2/6/2006 | 2/7/2006 | 2/7/2006 | A | CANC |
Troy Cobbley
|
|
|
|
INSP-Alarm Testing | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Forrest France
|
|
|
fire alarm finaled
|
INSP-Alarm Testing | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | FAIL |
Forrest France
|
|
|
No access to tenant
|
Plan assigned to (Mary) | 2/28/2005 | | 3/8/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 3/8/2005 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
Telephone call | | | 3/8/2005 | | DONE |
|
|
|
Request to Rick Groom for a revised matrix to include the HVAC shutdown.
|
Plan resubmittals received | | | 3/8/2005 | | DONE |
|
|
|
Received revised matrix via fax.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/8/2005 | | 3/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2005 | | DONE |
|
|
|
Spoke with Rick and told him that permit is ready & fees///3/8/05 8:30am BAS
|
Inspection Record Card- Fire | 3/8/2005 | | 3/8/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/8/2005 | | DONE |
|
|
|
|
Application received | | | 2/28/2005 | | |
|
|
|
|