INSP-Final Inspection | 5/9/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler for the pool area finaled. Ceilings are not taped, textured or painted yet but pendants are installed and canopies are on. Per fire sprinkler contractor finishes are to come later
|
INSP-Sprinkler Rough-in | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | PART |
Forrest France
|
|
|
Overhead sprinkler rough-in OK to cover above pool area. Noted on plans deletion of heads in non-combustible compartment due to construction change, re-submittals not required per Bill A.
|
Inspection Record Card- Fire | 3/14/2005 | | 3/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2005 | | |
|
|
|
|
Telephone call | | | 3/14/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 3/14/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/2/2005 | | 3/11/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/2/2005 | | 3/11/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2005 | | DONE |
|
|
|
|
Case Summary | | | 3/2/2005 | | DONE |
|
|
|
|
Application received | | | 3/2/2005 | | |
|
|
|
|