INSP-Final Inspection | 8/29/2005 | 8/30/2005 | 9/2/2005 | A | PASS |
Forrest France
|
|
|
Attic spacing issues have been corrected and inspected, permit finaled.
|
Issue and Print Permit | | | 8/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/26/2005 | | DONE |
|
|
|
Approved for TOC by Fire Marshal D. Hanneman, based on sprinkler and fire/ life safety inspection conducted by F. France today and discussion of D. Hanneman with Jackie Phelps, CM construction company. Correction list left on site by F. France; all items to be completed a soon as practicable.
|
Plan resubmittals received | | | 8/25/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/25/2005 | | 8/25/2005 | | PASS |
Bill Alexander
|
|
|
Fire Sprinkler Field Changes.
|
Plan assigned to (Bill) | 8/25/2005 | | 8/25/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/25/2005 | | 8/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2005 | | DONE |
|
|
|
tlk to randy ###-#### that permit and fees are ready to be picked up
|
INSP-Final Inspection | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Maximum head spacing for the attic heads is 120sq. ft. per review note #9. The uprights are overspaced in many locations off the walls in the attic. Upright sprinklers are not sloped with roof deck at the southend of the attic. CPVC piping is not tented correctly in the attic at the central area. Verify that the cpvc piping exposed in the mechanical room can be. Remove switch at the air compressor.
|
CHANGE STATUS TO (ISS) | | | 8/17/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/17/2005 | | 8/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2005 | | DONE |
|
|
|
lft ms with receptionist that permit and fees are ready to be picked up
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PASS |
Troy Cobbley
|
|
|
Eq bracing on the cpvc main is done and the pendant heads are now correct. Need to inspect the dry system and hydro test the wet system and all other final items.
|
Sprinkler Plan Check | 8/5/2005 | | 8/9/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/5/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2005 | 7/29/2005 | 7/29/2005 | P | PASS |
Troy Cobbley
|
|
|
contact dave. finish 24 hr air.; Air test passed
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2005 | 7/28/2005 | 7/28/2005 | P | PART |
Troy Cobbley
|
|
|
contact dave. 24 hr air test.; Starting pressure at just above 43psi at 12:00
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Troy Cobbley
|
|
|
Dry system hydro tested passed
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the cpvc piping in the existing areas. Wrong pendants installed. Will need to verify esch. for pendants. Need to provide eq. bracing for the cpvc mains
|
INSP-Conference | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Dave with Debest about possible rated walls in the existing school. I referred him back to the architect. I also noted exposed wood including beams and 2x4's located above the ceiling that have no sprinkler protection.
|
FIR-Aging Inspection | 6/15/2005 | 6/15/2005 | 6/15/2005 | | DONE |
Troy Cobbley
|
|
|
Work in progress
|
Miscellaneous action | | | 4/28/2005 | | DONE |
Bill Alexander
|
|
|
Tokk modified plans to front desk for returning and distribution
(2nd review)
|
Issue and Print Permit | | | 3/16/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/2/2005 | | 3/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/2/2005 | | 3/14/2005 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 3/14/2005 | | |
|
|
|
Problem finding section cut #1, Floor plan, FP3 to verifiy , construction, slope layers, etc.
Cannot determine coverage for center area (plans lack columns to identify exact location).
John Venche (desinger) came down and we found that the one set (of 5) submitted was partially existing and new (mixed), which was throwing the review off. Plans were not clearly identified.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2005 | | 3/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2005 | | DONE |
|
|
|
called ###-#### advised permit is ready & quoted the fees// JRR
|
Application received | | | 3/2/2005 | | |
|
|
|
|