INSP-Final Inspection | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled.
|
INSP-Final Inspection | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Forrest France
|
|
|
Fire alarm finaled.
|
INSP-Final Inspection | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | FAIL |
Forrest France
|
|
|
Phone #: ###-#### Phone lines not ready.
|
INSP-Final Inspection | 3/25/2005 | 3/30/2005 | 3/30/2005 | A | CANC |
Troy Cobbley
|
|
|
This si Grants Cell; Phone #: ###-#### Internet Inspection Request from: Terry Owsley
|
Plan assigned to (Mary) | 3/8/2005 | | 3/18/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 3/18/2005 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/18/2005 | | DONE |
|
|
|
Spoke with Terrie and told her that permit is ready & fees///3/18/05 10:11am BAS
|
Inspection Record Card- Fire | 3/18/2005 | | 3/18/2005 | | DONE |
|
|
|
|
Issue permit | | | 3/18/2005 | | |
|
|
|
|
Telephone call | | | 3/14/2005 | | DONE |
|
|
|
The plan did not include the FACP location. As there are two systems (separate addresses), the duct detector should be connected to the appropriate FACP. I requested a drawing of the FACP. I stated I would accept 81/2 x 11 faxed as long as I could read it.
|
Plan resubmittals received | | | 3/14/2005 | | DONE |
|
|
|
Received fax from Rob indicating the FACP location. The sheet shows it to the west of the 1 hour fire barrier.
|
Telephone call | | | 3/14/2005 | | DONE |
|
|
|
Talked to Rob, the duct detector is reporting to the wrong FACP. He will field survey and get back to me.
|
Application received | | | 3/8/2005 | | |
|
|
|
|