INSP-Final Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler finaled, Troy Cobbley has tested the flow switch during alarm testing under the associated fire alarm permit fir05-00232.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply piping within building passed rough-in inspection. Need to verify flow switch operation prior to final.
|
INSP-Supply line flush | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Forrest France
|
|
|
Fire supply line flush satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Forrest France
|
|
|
Underground fire supply hydrostatic test passed.
|
Issue and Print Permit | | | 4/20/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/22/2005 | | 4/19/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/8/2005 | | 4/19/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/19/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2005 | | DONE |
|
|
|
spoke with jeff anderson told him permit is ready and fees 4/19/05 3:45 pm BAS
|
Override - Parcel Holds | | | 4/19/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 4/19/2005 | | 4/19/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/8/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/22/2005 | | 3/31/2005 | | FAIL |
Bill Alexander
|
|
|
1. Plans are incomplete. Provide detailed clarification of required thrust protection on the underground supply entering the tunnel corridor. (BMC 7-01-50-901.2, IFC 105.4.2)
2. Plans are incomplete. Provide location and type of required earthquake bracing for the 6" main piped in the tunnel and through the riser room to point of replacement connection (fire pump supply-bottom ell). (BMC 7-01-50-901.2, IFC 105.4.2)
3. Submittal is incomplete. Provide clarification and locations of required flexure joints (for verification of E.Q. bracing addressed in Item #2 above).
4. Plans are incomplete. Provide type and location of hangers and its components supporting the pipe installing. (BMC 7-01-50-901.2, IFC 105.4.2)
5. Plans are incomplete. Provide location and size of any drain valves incorporating for trapped main/supply. (NFPA 13:8.15.2.5, BMC 7-01-50-901.2, IFC 105.4.2)
6. Submittal is incomplete. Provide manufacturers data submittals of all pertinent devices installing. (BMC 7-01-50:901.2, IFC 105.4.2)
7. Provide detail/information of transition from Ductile Iron to Schedule 10 steel. (NFPA 13-6.3.6*, 6.4.1, 6.4.5*, BMC 7-01-50-901.2, IFC 105.4.2)
8. Tunnel/Corridor requires a minimum construction separation for a type 1-A building from all other rooms and building (separations). Provide clearance and clarification of meeting this requirement for all penetrations made through rated fire barriers/walls. (IFC, BMC 7-01-50-901.2, IFC 105.4.2, 703, NFPA 13:A.9.3.4, A.9.3.4)
|
Miscellaneous action | | | 3/31/2005 | | DONE |
Bill Alexander
|
|
|
Returned documents to permit desk for returning.
|
Telephone call | | | 3/31/2005 | | DONE |
|
|
|
tlk to jeff anderson that permit failed and needs to be picked up
|
Telephone call | | | 3/31/2005 | | DONE |
|
|
|
gave failed plans to treasure valley fire/3/31/05/mls
|
Application received | | | 3/22/2005 | | |
|
|
|
|