INSP-Final Inspection | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | PASS |
Troy Cobbley
|
|
|
Suppression system operated correctly
|
Issue permit | | | 5/13/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 5/12/2005 | | 5/12/2005 | | PASS |
|
|
|
resubmittals acceptable subject to annotations and conditions specified in plan review comments. Discussed with JR Rogers of NW Finishing Equipment and Mike Lincoln, Boise River Fence and faxed to architect.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 5/12/2005 | | 5/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2005 | | DONE |
|
|
|
tlk to don kartchner ###-#### that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 4/28/2005 | | DONE |
|
|
|
Received 2 Copys of sheets A0.1, A1.1 2 Copys of Finishing Equipment NW, 2 FacsimileTransmittal letters, 2 Power Collection Booth, & 1 Letter. Taken to Sam R.
|
Sprinkler Plan Check | 4/6/2005 | | 4/19/2005 | | FAIL |
|
|
|
Review postponed pending further information from electrical and mechanical inspections and the need for a building permit due to discovered structural modifications and lack of CO.
Plan review failed. Review comments faxed to Boise River Fence and FirExpert. I called to advise them to call me to discuss any questions after they have reviewed the comments.
|
Plan resubmittals received | | | 4/7/2005 | | DONE |
|
|
|
Received 2 Finishing equipment,2 Spray booth,& 2 Powder coating operations. Taken to Sam R.
|
Meeting | | | 4/6/2005 | | DONE |
|
|
|
Meeting with Nathaniel, of Boise River Fence and JR Rogers of Finishing Equipment NW at their request to clarify and explain additional resubmitted information regarding the layout and design of the powder coating spray booth and bake oven. Material accepted for review.
|
Meeting | | | 3/29/2005 | | DONE |
|
|
|
Meeting with Mark and Nathaniel to discuss additional plans & details of dry powder booth they brought in. Reviewed IFC requirements in detail. They need resubmit a floor plan and additional information relevant to the IFC requirements for powder coating prior to our approval of this extinguishing system permit. they also need to pull a Mech permit notably due to ventilation requirements for the booth, and be sure to "attach" the FIR, MECH, and ELE permits together. Per Marlene, there is no need for a building permit for this since it is a piece of equipment with no structural requirements.
|
Telephone call | | | 3/24/2005 | | DONE |
|
|
|
telcon from Nathaniel at Boise River Fence. Discussed need for additional information on dry powder booth necessary for review of the FP system and approval of the operation per IFC 15. They requested a meeting to bring in more material to discuss. Set up for 3/29/05, 10:30 am.
|
Application received | | | 3/23/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 3/23/2005 | | | | |
|
|
|
|