INSP-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Troy Cobbley
|
|
|
(dry system trip test)call Jonathan for details. Thanks; Phone #: ###-#### Dry system tripped in 34.9 seconds. Monitoring agency received signals. Permit finaled.
|
INSP-Alarm Testing | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Troy Cobbley
|
|
|
(dry system trip test)call Jonathan for details. Thanks; Phone #: ###-#### Dry system tripped in 34.9 seconds. Monitoring agency received signals. Permit finaled.
|
INSP-Final Inspection | 7/12/2005 | 7/15/2005 | 7/15/2005 | P | FAIL |
Troy Cobbley
|
|
|
Contractor tripped the wrong dry system. Per Bill Alexander if the new dry pipe valve exceeds 60 seconds for water at the inspectors test the total capacity of this dry pipe system will need to be provided to the inspector. Will also need to verify signals to panel and monitoring agency.
|
FIR-Aging Inspection | 6/29/2005 | 6/29/2005 | 6/29/2005 | | NR |
Troy Cobbley
|
|
|
Per Mike with Shilo, ###-####, work is complete and he will call in inspection.
|
Plan assigned to (Bill) | 3/28/2005 | | 3/30/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/29/2005 | | 3/30/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/30/2005 | | |
|
|
|
|
Telephone call | | | 3/30/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Inspection Record Card- Fire | 3/30/2005 | | 3/30/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/30/2005 | | DONE |
|
|
|
|
Application received | | | 3/28/2005 | | |
|
|
|
|