INSP-Final Inspection | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 12:20:43 PM. Contact: ###-####.
|
INSP-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler permit finaled
|
Telephone call | | | 8/9/2005 | | DONE |
|
|
|
gave plans to simplex customer
|
Sprinkler Plan Check | 8/5/2005 | | 8/8/2005 | | PASS |
|
|
|
Chaged fire sprinkler heads from Q.R. to the original installed manufacturers standard response.
|
Miscellaneous action | | | 8/8/2005 | | DONE |
|
|
|
Took documents (to be attached to site plans) to permit desk for reissuing.
|
Plan resubmittals received | | | 8/5/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/4/2005 | 8/5/2005 | 8/4/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Bills permission until the fire sprinkler plans are resubmitted and approved showing the correct pendant heads used.
|
INSP-Final Inspection | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PART |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover. None of the interior partions have been installed. Final approval will be given when spacing can be verified with the walls
|
Issue permit | | | 4/18/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/5/2005 | | 4/15/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/5/2005 | | 4/15/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/15/2005 | | 4/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2005 | | DONE |
|
|
|
Left message on voice mail for Tom that permit is ready & fees///4/15/05 12:15pm BAS
|
Application received | | | 4/5/2005 | | |
|
|
|
|