INSP-Final Inspection | 1/24/2006 | 1/24/2006 | 1/24/2006 | | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue and Print Permit | | | 1/19/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/17/2006 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
|
INSP-Final Inspection | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | FAIL |
Troy Cobbley
|
|
|
Horns out of sync in the lobbies and the strobes are out of sync between the lobby and the walkways. Need to run the new NAC panel through the hoops, verify signals and get the NFPA 72 forms.
|
INSP-Final Inspection | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | FAIL |
Troy Cobbley
|
|
|
Horns and strobes not sync'd. Need nfpa 72 forms and to verify signals.
|
INSP-Final Inspection | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for items from the past inspection that weren't corrected yet. Strobes aren't sync'd. A reinspection fees is being applied.
|
INSP-Final Inspection | 12/7/2005 | 12/7/2005 | 12/12/2005 | P | CANC |
Troy Cobbley
|
|
|
lynda; Phone #: 4###-#### Internet Inspection Request from: Barbara Moore
|
INSP-Final Inspection | 12/5/2005 | 12/6/2005 | 12/7/2005 | A | FAIL |
Troy Cobbley
|
|
|
Nobody showed up for inspection
|
INSP-Final Inspection | 11/28/2005 | 11/29/2005 | 11/30/2005 | A | DEFR |
Forrest France
|
|
|
linda; Phone #: ###-#### Per conversation with Linda the inspection will be scheduled for Monday 12/5 as agreed.
|
INSP-Final Inspection | 11/21/2005 | 11/22/2005 | 11/22/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today.
|
Alarm Plan Check | | | 11/3/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/3/2005 | | 11/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2005 | | DONE |
|
|
|
Spoke with Lynde and told her that permit is ready & fees///11/03/05 8:20am BAS
|
(F) Reprint permit | | | 11/3/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/3/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/24/2005 | | DONE |
|
|
|
|
Case Summary | | | 10/24/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | FAIL |
Troy Cobbley
|
|
|
lynda; Phone #: ###-#### See city approved plans, sheet 1 for list of items needing correction.
|
INSP-Final Inspection | 9/8/2005 | 9/9/2005 | 9/13/2005 | A | CANC |
Forrest France
|
|
|
Contractor has rescheduled inspection for a later date.
|
INSP-Final Inspection | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | CANC |
Forrest France
|
|
|
No time available today for this inspection, spoke with linda from mountain alarm at ###-####, she will reschedule inspection for next week.
|
Issue and Print Permit | | | 8/2/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/1/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/1/2005 | | 8/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/1/2005 | | DONE |
|
|
|
Left voice message for Lynde that permit is ready & fees///8/1/05 10:30am BAS
|
Plan assigned to (Mary) | 4/5/2005 | | 8/1/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/19/2005 | | 8/1/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/21/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 7/18/2005 | | FAIL |
|
|
|
In checking the plans and riser, all addressing was incorrect. No comments were written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/11/2005 | | |
|
|
|
added per Mary
|
Case Summary | | | 6/7/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/11/2005 | | FAIL |
|
|
|
Resubmittal required. Comments faxed to Lynde Jones at Mountain Alarm and John Rimby at Mulder Engineering.
|
Application received | | | 4/5/2005 | | |
|
|
|
|