INSP-Final Inspection | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PASS |
Forrest France
|
|
|
Fire alarm finaled.
|
INSP-Final Inspection | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | FAIL |
Troy Cobbley
|
|
|
Relocate and test the door holder, verify correct heights for all a/v's and repair/test fire dampers.
|
INSP-Final Inspection | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | FAIL |
Forrest France
|
|
|
Add smoke detection in room 118, add notification in office room 104 per note #7 on review comments, provide updated map at FACP, provide sign at room door containing FACP, adjust heights on AV's to meet reqirements of note #10.
|
Issue permit | | | 4/27/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 4/7/2005 | | 4/26/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/26/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2005 | | DONE |
|
|
|
Spoke with Chris and told him that permit is ready & fees///4/26/05 2:50pm BAS
|
Inspection Record Card- Fire | 4/26/2005 | | 4/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2005 | | DONE |
|
|
|
Spoke with Greg Hayne at Elks Rehab, the cooking hoods are being monitored by the FA system as a supervisory. I explained the code requirement of the signal to be alarm. Greg stated that it would be no problem to have that reprogrammed. I told him that I would include it in the notes for this permit and the inspector will verify the three (3) hoods during the inspection for the first floor.
|
Telephone call | | | 4/21/2005 | | DONE |
|
|
|
Called Greg Hayne, Elks, to discuss the cooking hood monitoring as a supervisory input to the FA system. I left a message.
|
Application received | | | 4/7/2005 | | |
|
|
|
|