INSP-Final Inspection | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 3/27/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Forrest France
|
|
|
UG supply line flush performed satisfactory.
|
INSP-Sprinkler Rough-in | 3/27/2006 | 3/28/2006 | 3/28/2006 | A | PART |
Forrest France
|
|
|
UG hydrostatic test passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2006 | 3/24/2006 | 3/24/2006 | P | CANC |
Forrest France
|
|
|
UG hydro test canceled by contractor, not ready for inspection.
|
Issue and Print Permit | | | 4/27/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/21/2005 | | 4/26/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/21/2005 | | 4/26/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/26/2005 | | 4/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2005 | | DONE |
|
|
|
Left voice message that permit is ready and fees///4/26/05 3:40pm BAS
|
Application received | | | 4/21/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 8/18/2005 | 8/19/2005 | | A | |
Unknown
|
|
|
Contact: Charles - UG Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|