INSP-Final Inspection | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/7/2005 | 9/9/2005 | 9/9/2005 | A | PART |
Forrest France
|
|
|
Hydrostatic test of the UG fire supply line passed inspection. Flushing of the UG supply performed after the hydro was also satisfactory.
|
INSP-Sprinkler Rough-in | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PART |
Troy Cobbley
|
|
|
Inspection was for underground cover. Piping matches resubmitted plans and is ok to cover.
|
INSP-Sprinkler Rough-in | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | FAIL |
Troy Cobbley
|
|
|
Concrete truck had mechanical problem and couldn't make it till possibly the end of the day and the truck for the bedding had not shown up yet. Contractor will reschedule for the morning.
|
INSP-Sprinkler Rough-in | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | CANC |
Forrest France
|
|
|
Inspection cancelled per. contractor due to poor weather conditions. Work not ready, will re-schedule.
|
Issue and Print Permit | | | 5/5/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/26/2005 | | 5/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/26/2005 | | 5/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2005 | | DONE |
|
|
|
called spoke with Don permit is ready and fees 5/4/05 11:41am LEM
|
Inspection Record Card- Fire | 5/4/2005 | | 5/4/2005 | | DONE |
|
|
|
|
Application received | | | 4/26/2005 | | |
|
|
|
|