INSP-Final Inspection | 6/9/2005 | 6/9/2005 | 6/9/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Sprinkler Rough-in/Hydro | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PART |
Forrest France
|
|
|
Fire sprinkler rough in OK for cover.
|
Telephone call | | | 6/1/2005 | | DONE |
|
|
|
tlk to catherine ###-#### that permit is ready to be picked up
|
Sprinkler Plan Check | 5/27/2005 | | 5/31/2005 | | PASS |
Bill Alexander
|
|
|
Problem with installation (modification). Requested desinger to verify # of heads on 1" as originally questioned and recommended changes in 1st review.
|
Miscellaneous action | | | 5/31/2005 | | DONE |
|
|
|
Took approved stamped plans to Permit Desk for returning.
|
INSP-Sprinkler Rough-in | 5/26/2005 | 5/27/2005 | 5/27/2005 | A | CANC |
Forrest France
|
|
|
Cancel inspection per Jim Danes with DeBest Fire Protection.
|
Plan resubmittals received | | | 5/27/2005 | | |
|
|
|
|
Issue and Print Permit | | | 5/9/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/28/2005 | | 5/6/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/28/2005 | | 5/6/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/6/2005 | | 5/6/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2005 | | DONE |
|
|
|
tlk to catherine ###-#### that permit and fees are ready to be picked up
|
Application received | | | 4/28/2005 | | |
|
|
|
|