INSP-Final Inspection | 7/13/2005 | 7/14/2005 | 7/14/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed inspection.
|
INSP-Final Inspection | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | FAIL |
Forrest France
|
|
|
Provide auxillary drain signs to identify valve location.
|
INSP-Final Inspection | 7/1/2005 | 7/1/2005 | 7/1/2005 | P | PART |
Forrest France
|
|
|
Overhead hydro passed. Need ceiling tile installed and alarms prior to final.
|
INSP-Sprinkler Rough-in | 6/27/2005 | 6/28/2005 | 6/28/2005 | A | PASS |
Troy Cobbley
|
|
|
Rough-in for this tenant space is ok. Ceiling tile is ok to install. Items on the shell correction notice for this area have been corrected.
|
INSP-Sprinkler Rough-in | 6/16/2005 | 6/17/2005 | 6/17/2005 | A | FAIL |
Forrest France
|
|
|
Need re-submittals on core and shell work for approval of fir05-00045 prior to any approval of TI permits.
|
Issue and Print Permit | | | 5/19/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 5/9/2005 | | 5/18/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/9/2005 | | 5/18/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/18/2005 | | 5/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/18/2005 | | DONE |
|
|
|
tlk to tom easton ###-#### that permit and fees are ready to be picked up
|
Application received | | | 5/9/2005 | | |
|
|
|
|