Permit NumberFIR05-00297
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 314 S 9TH ST Unit: 100
Project NameBODO BLDG #4-Foster Building
Customer Number 
ePlanReview 
Description
BODO - BUILDING #4 (FOSTER BLD SHELL & CORE) - To install a complete wet pipe fire sprinkler system (OH-2) in an existing 8,500-ft/2, four story, with basement, historical combustible constructed building shell and core for future retail, office and possible residential tenants. Fire sprinklers are being used for story increase. All fire sprinkler work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service supply was installed under FIR05-00239. The original fire sprinkler piping was removed under FIR05-00244 (all by the same contractor). This permit is attached to building permit: BLD04-01323. This is a shell and core fire sprinkler permit only. Separate tenant improvement permits will be required to finish this building for any occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/20/20064/21/20064/21/2006APASS
DetailsForrest France
Required corrections have been completed, fire sprinkler finaled.
INSP-Sprinkler Rough-in/Hydro4/17/20064/18/20064/18/2006APASS
DetailsTroy Cobbley
Basement hydro test passed.
INSP-Final Inspection4/14/20064/17/20064/17/2006PFAIL
DetailsTroy Cobbley
Basement hydro test failed again. Balldrip did not operate, riser strickers, riser tag and backflow preventor certification still needs to be done. No final inspection performed.
INSP-Sprinkler Rough-in/Hydro4/14/20064/17/20064/17/2006AFAIL
DetailsTroy Cobbley
Basement hydro test failed again. Balldrip did not operate, riser strickers, riser tag and backflow preventor certification still needs to be done.
INSP-Final Inspection4/13/20064/14/20064/17/2006PNR
DetailsForrest France
Project is not ready for final inspection.
INSP-Sprinkler Rough-in/Hydro4/13/20064/14/20064/14/2006APART
DetailsTroy Cobbley
Fourth floor hydro test passed. Basement hydro test failed.
INSP-Final Inspection4/13/20064/14/20064/13/2006ACANC
DetailsForrest France
Contact: Jason; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro4/5/20064/6/20064/6/2006AFAIL
DetailsForrest France
Overhead hydrostatic test failed to maintain pressure on the 4th floor and the standpipe, basement system not tested at this time.
INSP-Sprinkler Rough-in/Hydro3/28/20063/29/20063/29/2006AFAIL
DetailsForrest France
Flexible couplings are required on the 4" riser main above and below each floor penetration as the min. seismic clearance is not provided at these locations, the min. separation for heads at the east corner of each floor is exceeded.
INSP-Sprinkler Rough-in9/15/20059/16/20059/16/2005AFAIL
DetailsForrest France
Coverage is lacking under stairs at first floor, 3/4 upright heads in four locations as marked on approved plans exceed minimum spacing allowance, some sprigs at first floor corridor are not vertical, elevator pit needs the sw heads and cages installed, verify heads in stairway are 155 degree, pipe drain from ball drip at west FDC to an approved location, the riser and ceilings in exit corridors are not complete yet, this inspection was for BODO 4 two story building.
INSP-Sprinkler Rough-in/Hydro9/15/20059/15/20059/15/2005PCANC
DetailsForrest France
Inspection has been rescheduled for friday am 9/16/05.
INSP-Supply line flush9/15/20059/15/20059/15/2005PPART
DetailsForrest France
UG fire supply line flush is satisfactory.
Permit Ready to Issue  6/17/2005  
Inspection Record Card- Fire6/17/2005 6/17/2005 DONE
Telephone call  6/17/2005 DONE
left mess that permit is ready
Issue and Print Permit  6/17/2005 DONE
Plan assigned to (Bill)5/17/2005 6/16/2005 DONE
Sprinkler Plan Check6/10/2005 6/16/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/16/2005 DONE
Plan resubmittals received  6/13/2005 DONE
Case Summary  6/13/2005 DONE
Case Summary  6/13/2005 DONE
Sprinkler Plan Check5/17/2005 5/26/2005 FAIL
DetailsBill Alexander
The data has been moved to a Word document attached to this case.
Telephone call  5/26/2005 DONE
lft vm with receptionist for John V that permit failed return
Application received  5/17/2005