COLTRIN BUILDING (SHELL) -To install a new overhead wet and dry pipe fire sprinkler system in a 18,490-ft/2, two story, type V-B, fully fire sprinklered office/retail shell building. First floor 14,000-ft/2, 2nd floor 4,490-ft/2. No occupancy is authorized by this permit. Fire sprinklers are used for area and story increase. The underground fire service supply main was installed under FIR05-00222. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-02020.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/14/20062/15/20062/15/2006APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/7/20062/7/20062/7/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
INSP-Final Inspection2/2/20062/3/20062/3/2006PFAIL
DetailsTroy Cobbley
Provide approved hangers for th 4" main. Provide correct attachment for the eq bracing. Provide forward flush. Provide review comments. Provide correct air compressor and air maintenance device.
INSP-Sprinkler Rough-in1/25/20061/26/20061/26/2006PPASS
DetailsTroy Cobbley
Sprinkler piping in the second floor attic and the east tenant improvement space are ok for cover
INSP-Sprinkler Rough-in1/17/20061/19/20061/19/2006APART
DetailsTroy Cobbley
The south wing piping in the attic area is ok to cover with insulation
Issue and Print Permit  1/9/2006 DONE
Sprinkler Plan Check12/30/2005 1/6/2006 PASS
DetailsBill Alexander
Plan assigned to (Bill)12/30/2005 1/6/2006 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/6/2006 DONE
Inspection Record Card- Fire1/6/2006 1/6/2006 DONE
Permit Ready to Issue  1/6/2006 DONE
Telephone call  1/6/2006 DONE
tlk to tom easton ###-#### that permit and fees are ready to be picked up
INSP-Supply line flush1/4/20061/5/20061/5/2006APASS
DetailsTroy Cobbley
Underground flush passed
Telephone call  1/5/2006 DONE
lft vm for tom easton - ###-#### that permit failed and needs to be picked up
INSP-Supply line flush1/4/20061/4/20061/4/2006PFAIL
DetailsTroy Cobbley
united water did not show up
Plan resubmittals received  12/30/2005 DONE
INSP-Sprinkler Rough-in12/9/200512/12/200512/12/2005AFAIL
DetailsTroy Cobbley
No inspection is supposed to be called in but I did it anyway. Alot of changes have taken place with the piping. Per fitter these changes are reflected on another resubmittal that is in for review. This includes heads repiped and added in the second floor dry remote area, branchline added on the lower level dry system and main reroutes. Dry system heads dont meet 8.6.5.2.1.6 for spacing.
INSP-Sprinkler Rough-in11/22/200511/23/200511/22/2005PCANC
DetailsTroy Cobbley
No time for inspection
INSP-Sprinkler Rough-in11/21/200511/22/200511/22/2005ACANC
DetailsTroy Cobbley
No time for inspection
FIR-Aging Inspection9/8/20059/8/20059/13/2005 NR
DetailsTroy Cobbley
Work is in progess. Job only has a partial approval. Resubmittals required.
Sprinkler Plan Check6/21/2005 6/23/2005 PART
DetailsBill Alexander
12. Calculation problems Test Area #1: (June 22, 2005 - Area piping resubmittals required)
d. Line piping on the plans do not correlate with piping in the calcs. Revise and resubmit.
*June 22, 2005 - Provided corrections. Mains calculated for Area #1 incorporates 3" mains and plan show 2½". Mains through the riser Node point "10" shall be installed 3" (thinwall) minimum. Provide corrected resubmittal plans.

e. Nodes 7 to 8 includes an elevation pressure loss (riser) for 12'-0" and the plans show 15'-0"? Same node pipe lengths show 38'-10" yet the 15'-0" (riser) length was not included? Clarify and resubmit.
*June 22, 2005 - Not addressed. Clarify and resubmit.

f. Node 10 is nonexistent. Include clarification of the "5.197" psi increase from TOR to 10.
*June 22, 2005 - Not addressed. It is assumed as redlined on the plans which is impossible to determine since the riser is not dimensioned. Verify assumption location and resubmit.

13. Calculation problems Test Area #2:
c. Node 10 is nonexistent on the plans. Include clarification of the "5.197" psi increase from TOR to 10.
*June 22, 2005 - Not addressed. Provide clarification as also requested in item "12.d." above.

14. Calculation problems Test Area #3:
g. Node 10 is nonexistent on the plans.
*June 22, 2005 - Still missing. Reference item # "12.f." above.
Miscellaneous action  6/23/2005 DONE
Took plans & documents to front desk for distribution. 2nd review, no fee.
Telephone call  6/23/2005 DONE
lft ms with secretary for tom ###-#### that permit and fees are ready to be picked up
Plan resubmittals received  6/21/2005 DONE
Issue and Print Permit  6/9/2005 DONE
Inspection Record Card- Fire6/3/2005 6/3/2005 DONE
Permit Ready to Issue  6/3/2005 DONE
Telephone call  6/3/2005 DONE
tlk to tom easton that permit and fees are ready to be picked up
Plan assigned to (Bill)5/24/2005 6/2/2005 DONE
Sprinkler Plan Check5/24/2005 6/2/2005 PART
DetailsBill Alexander
The data has been moved to a Word document attached to this case.
PLANS/APPL TAKEN TO FRONT DESK  6/2/2005 DONE
Application received  5/24/2005