INSP-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Forrest France
|
|
|
UG permit finaled.
|
INSP-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit passed final inspection.
|
INSP-Supply line flush | 9/8/2005 | 9/8/2005 | 9/8/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply line flush is satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PART |
Forrest France
|
|
|
UG fire supply hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 8/5/2005 | 8/5/2005 | 8/5/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply is acceptable to cover.
|
INSP-Supply line flush | 8/3/2005 | 8/4/2005 | 8/4/2005 | P | FAIL |
Forrest France
|
|
|
Inspection was for an UG hydrostatic test and phase two UG cover inspection. Two 45 degree joints, the testing blank and a thrust block at the 90 are buried, preventing inspection The hydrostatic test was not ready.
|
Inspection Record Card- Fire | 7/18/2005 | | 7/18/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/18/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/8/2005 | | 7/15/2005 | | PASS |
Bill Alexander
|
|
|
2nd phase
|
Miscellaneous action | | | 7/15/2005 | | DONE |
|
|
|
Took plan to permit desk for issuing. 2nd review no fee
|
Plan resubmittals received | | | 7/8/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 6/10/2005 | 6/10/2005 | 6/10/2005 | P | PART |
Forrest France
|
|
|
Fire supply UG stub out and riser piece OK to cover. Verify seismic clearance and that no C900 is exposed above floor slab at a later date.
|
Issue and Print Permit | | | 6/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/7/2005 | | 6/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2005 | | |
|
|
|
|
Telephone call | | | 6/7/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 5/25/2005 | | 6/6/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/25/2005 | | 6/6/2005 | | PASS |
Bill Alexander
|
|
|
1st Phase
6/3/2005 - 10:00am returned answer attached.
6/3/2005 - 8:15am - Emailed
1. The building permit submitted for this work to be attached too is related to the existing Building "D"? This work should be associated with new Building "E", BLD05-00315 (per your drawing)?
2. Is this 5'-0" out underground work the complete scope of work under this permit requesting? Will you be doing any more underground work on this line in the future?
3. I cannot accept your underground riser since it does not meet AWWA, Building and Plumbing Code. You are exposing a critical and required system with PVC piping in this facility without correct and approved "barrier protection/separation". I will lay this submittal to the side temporarily. Modify the riser with an approved carbon steel and resubmit and fax the modified riser to: ###-#### with transmittal letter, revised permit application, which includes the correct BLD number (ASAP), or I must deny the work and you will be required to submit through the normal channels.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 6/3/2005 | | DONE |
|
|
|
Emailed designer for clarification and corrections for immediate response to continue the review. Will wait this day and then fail it if no response is provided.
|
Application received | | | 5/25/2005 | | |
|
|
|
|