INSP-Final Inspection | 4/5/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | CANC |
Forrest France
|
|
|
Contact Matt. R-in and Hydro.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PART |
Forrest France
|
|
|
Beam clamps and retaining straps on hangers in theaters verified, two hangers missing straps and one hanger with strap not attatched to beam....these hangers were corrected while on site.
|
Issue and Print Permit | | | 6/15/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/13/2005 | | 6/14/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/14/2005 | | 6/14/2005 | | PASS |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 6/14/2005 | | 6/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2005 | | DONE |
|
|
|
tlk to randy ###-#### that permit and fees are ready to be picked up
|
Case Summary | | | 6/13/2005 | | |
|
|
|
|
Application received | | | 6/13/2005 | | |
|
|
|
|