Permit EXPIRED | | | 3/16/2010 | | DONE |
|
|
|
The inspector seems to recall the building that was built on top of the underground did not require sprinklers.
|
Miscellaneous action | | | 3/12/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | PASS |
Troy Cobbley
|
|
|
Piping is ok to cover. Hydro test passed. Flush to be done when permit is pulled for construction of future building.
|
INSP-Sprinkler Rough-in | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | PART |
Troy Cobbley
|
|
|
Underground piping is ok to cover up to the gate valve. Contractor needs to submit plans showing the valve. Prior to cover on the rest of the piping the galvanized pipe needs to be removed.
|
Issue permit | | | 6/21/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 6/17/2005 | | 6/20/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/17/2005 | | 6/20/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/20/2005 | | 6/20/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2005 | | DONE |
|
|
|
tlk to brad ###-#### that permit and fees are ready to be picked up
|
Application received | | | 6/17/2005 | | |
|
|
|
|