Case Summary | | | 11/10/2009 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/28/2005 | 11/29/2005 | 11/29/2005 | P | PASS |
Forrest France
|
|
|
The two phase project for demo has been completed and passed inspection, permit finaled.
|
INSP-Final Inspection | 10/28/2005 | 10/28/2005 | 10/28/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection due to BODO project inspections.
|
Plan assigned to (Bill) | 6/23/2005 | | 6/27/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/23/2005 | | 6/27/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2005 | | DONE |
|
|
|
|
Case Summary | | | 6/27/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/27/2005 | | 6/27/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2005 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fee are ready to be picked up
|
Issue and Print Permit | | | 6/27/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 6/24/2005 | | DONE |
|
|
|
Need more information in order to review and complete permit.
Sent Email regarding:
1. This appears to be in 2 phases. Phase #1 is now and #2 will be when they start to demo the mezzanine?
2. Send me a (simple) site and a (simple) building area, plan where this work is in the facility.
3. Is this is on a wet system?
4. Is Phase #1 associated with the roof (piping), an upper level (dropped ceiling), or lower floor level (piping)?
|
Application received | | | 6/23/2005 | | |
|
|
|
|