Permit Information
Permit NumberFIR05-00372
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 301 S CAPITOL BLVD
Project NameBODO BUILDING 7 SPR
Customer Number 
ePlanReview 
Description
BODO - BUILDING #7 (SHELL & CORE) - To install a complete overhead wet fire sprinkler system in a new 135,950-ft/2, three story, noncombustible, fully fire sprinklered shell building for future multi-plex theater, offices, retail and restaurant tenants. This new building is being constructed with nonseparated uses with the A-1 Occupancy being the most restrictive. The fire sprinkler system is being used for area increase. All fire sprinkler and standpipe work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service supply was installed separately under FIR05-00039. This fire permit is attached to building permit: BLD04-01324. This is a shell and core permit only. Separate tenant improvement permits are required to finish this building for occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/28/20063/29/20063/29/2006APASS
DetailsForrest France
Items on previous correction notices have been completed, fire sprinkler permit finaled.
INSP-Final Inspection3/17/20063/20/20063/20/2006AFAIL
DetailsForrest France
Some items on previous correction notice dated 11/10/05 have not been completed including the missing escutcheon at the womens restroom lobby area, missing coverage at the roof hatch. Two heads in the east projection room are spaced incorrectly for min. spacing, no access to storage room next to managers office for OH spacing verification. Plans have been resubmitted for OH spacing at the projection rooms, however an alternate agreement for "no storage allowed" has been accepted in lieu of sprinkler modifications.
Miscellaneous action  3/3/2006 DONE
The light hazard design within the two projection rooms has been approved by Sam Rogers and Dave Hanneman, subject to the condition that the rooms will not be used for any storage except the in-use storage of film in shipping canisters on grated metal shelf racks and for no other uses except the fixed projection equipment. Signs are to be posted on the doors leading to these rooms and in the rooms stating "NO STORAGE ALLOWED IN PROJECTION ROOM" Dave Hanneman will have a fire inspector make periodic unannounced inspections to verify. If these conditions are not maintained, sprinkler re-design will be required.
Sprinkler Plan Check12/30/2005 1/17/2006 PASS
DetailsBill Alexander
Plan assigned to (Bill)12/30/2005 1/17/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/17/2006 DONE
Permit Ready to Issue  1/17/2006 DONE
Telephone call  1/17/2006 DONE
tlk to Catherine ###-#### that permit and fees are ready to be picked up
CHANGE STATUS TO (ISS)  1/17/2006  
re-issued
Inspection Record Card- Fire1/17/2006 1/17/2006 DONE
(F) Reprint permit  1/17/2006 DONE
Plan resubmittals received  12/30/2005 DONE
Sprinkler Plan Check12/1/2005 12/19/2005 FAIL
DetailsBill Alexander
The Projection booth/rooms have been found to be under designed (Light Hazard Occupancy).
Received a letter dated 11/21/2005 from BB-A Architects addressing the "Projection Rooms" as acceptable in being protected for the same.
These rooms are not remotely similar to:
a. Churches
b. Clubs
c. Eaves and overhangs, if of combustible construction with no combustibles beneath
d. Educational
e. Hospitals
f. Institutional
g. Libraries, except large stack rooms
h. Museums
i. Nursing or convalescent homes
j. Offices, including data processing
k. Residential
l. Restaurant seating areas
m. Theaters and auditoriums*, excluding stages and prosceniums (*seating)
n. Unused attics

*Auditorium space types are areas for large meetings, presentations, and performances. Auditorium space type facilities may include assembly halls, exhibit halls, auditoriums, and theaters. Auditorium space types do not include such features as sound reinforcement systems, audiovisual systems and projection booths, projection screens, food service areas/facilities, proscenium stages with heights greater than 50'- 0" or fly gallery, orchestra pits, revolving or hydraulic stage platforms, flying balconies, movable seating, or billboard systems.

The projection room is will be designated as equipment room with possible misc. storage. This type of use will require Ordinary Hazard occupancy protection minimum (excluding the use of nitrocellulose film), as clarified under the NFPA 13 Handbook (page 81) 5.3. This agency may allow a minimum protection design for Ordinary Hazard Group 1 (if storage is minimized meeting requirements of NFPA 13 Table 12.1.10.1.1 for this class hazard. Revise and resubmit area protection meeting this requirement.
Miscellaneous action  12/19/2005 DONE
Returned plans to Permit Desk to return for corrections
Telephone call  12/19/2005 DONE
called left message w/Mandi for Catherine that permit failed and needs to be picked up
Plan resubmittals received  12/1/2005  
INSP-Final Inspection11/10/200511/10/200511/10/2005PCANC
DetailsForrest France
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore- cambry cancel 9:05 pm
INSP-Final Inspection11/10/200511/10/200511/10/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
Override - Parcel Holds1/1/19001/1/190011/10/2005  
fire inspection
INSP-Final Inspection11/9/200511/9/200511/9/2005PFAIL
DetailsForrest France
An additional 11 item correcton notice was given to the subcontractor, inspection stopped at this point due to the excessive number of defficiencies. Mezzanine not inspected for final yet, contractor to walk project again and call for re-inspection when project is code compliant. Re-inspection fees apply.
Override - Parcel Holds1/1/19001/1/190011/9/2005  
final
INSP-Final Inspection11/7/200511/7/200511/7/2005PFAIL
DetailsForrest France
Missing two escutcheons at box office area, two heads at the concession bar are spaced incorrectly, one head in the men's restroom is blocked by a column, head appears overspaced at atrium above east escalators, the inspection was concluded at this time-contractor to walk through project and reschedule inspection when complete.
Override - Parcel Holds1/1/19001/1/190011/7/2005  
INSP-Sprinkler Rough-in/Hydro10/28/200511/1/200511/1/2005PPART
DetailsForrest France
Provide resubmittals, clock tower has unprotected combustible construction, tenant demising walls obstruct coverage in some areas, theatre needs final walk -through.
INSP-Final Inspection10/31/200510/31/200510/31/2005PFAIL
DetailsForrest France
Approval pending items remaining on correction notice including forward flow test, roof standpipe flow test, heads under overhead door at riser, resubmittals for box office changes, tenant demising wall coverage obstructions, lacking coverage in clock tower for combustibles, escutcheons at locations in theatre spaces.
Override - Parcel Holds1/1/19001/1/190010/31/2005  
fire inspection
INSP-Sprinkler Rough-in10/27/200510/28/200510/28/2005AFAIL
DetailsForrest France
See correction notices for listing of defficient items.
Override - Parcel Holds1/1/19001/1/190010/28/2005  
INSP-Sprinkler Rough-in/Hydro10/26/200510/27/200510/27/2005AFAIL
DetailsForrest France
Sheet FP2 only for overhead shell rough-in inspected and an 18 item correction notice issued.
Override - Parcel Holds1/1/19001/1/190010/27/2005  
INSP-Sprinkler Rough-in/Hydro10/25/200510/26/200510/26/2005PDEFR
DetailsForrest France
Inspection to be completed tomorrow AM.
INSP-Sprinkler Rough-in/Hydro10/24/200510/25/200510/25/2005PFAIL
DetailsForrest France
Overhead hydrostatic test of theatres and mezzanine off floor control valve south stair lost approx. 2 psi, contractor to have checked tomorrow for re-inspect. Contractor is not ready for overhead rough-in inspection for the shell at this time.
INSP-Sprinkler Rough-in/Hydro10/19/200510/20/200510/20/2005APART
DetailsForrest France
Witnessed testing and start up of the fire pump, tested at 150%, 100%, rated flow and shutoff, tested jockey pump, need to run drain from pump casing, need to install sensing lines per NFPA 20.
INSP-Sprinkler Rough-in10/18/200510/20/200510/20/2005ANR
DetailsForrest France
Per Matt the shell rough-in is not ready for inspection at this time.
INSP-Sprinkler Rough-in/Hydro10/18/200510/19/200510/19/2005AFAIL
DetailsForrest France
The box office overhead hydro lost pressure to 197 psi., the UG supply hydro lost 5 psi., the standpipe, office depot shell area, and ann taylor area not tested at this time.
INSP-Sprinkler Rough-in/Hydro10/12/200510/13/200510/13/2005ACANC
DetailsForrest France
contact: matt - UG hydro test and hydro test for box office.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in10/3/200510/3/200510/3/2005PFAIL
DetailsForrest France
Inspection was for cover at hard lids in the main box office lobby area first floor on sheet FP2. Fail inspection, provide resubmittals for several changes in pipe routing from the approved plans, two heads are 5' apart, one retaining strap is not fastened to the beam, not all heads are cut in.
INSP-Sprinkler Rough-in8/30/20058/31/20058/31/2005AFAIL
DetailsForrest France
Two heads in 2nd floor restroom hard lid are spaced 5' apart, missing retaining strap on hanger in hallway, incorrect head spacing at soffit as marked on approved plans, inspection was for sheet FP 5 second floor.
Override - Parcel Holds1/1/19001/1/19008/30/2005  
INSP-Sprinkler Rough-in8/18/20058/18/20058/18/2005PCANC
DetailsForrest France
matt; Phone #: ###-#### Cancel inspection per Matt, he will reschedule for tomorrow.
Override - Parcel Holds1/1/19001/1/19008/18/2005  
INSP-Sprinkler Rough-in8/8/20058/9/20058/9/2005AFAIL
DetailsForrest France
Missing 4-way EQ brace on atrium main, heads in east soffit are overspaced, one line is installed as 1" pipe--the plan shows 11/4 pipe, missing head in lower west soffit hard lid, need to verify there are no obstructions to coverage caused at the juncture of soffits and grid ceiling when the grid is installed.
Override - Parcel Holds1/1/19001/1/19008/8/2005  
INSP-Sprinkler Rough-in7/25/20057/26/20057/26/2005PPART
DetailsForrest France
2nd floor projection room and mezzanine, theatres #8 and #9 are good for cover. Final head location will be examined after ceiling grid is installed. Approved rough-in areas are initialed on stamped plan set.
Override - Parcel Holds1/1/19001/1/19007/25/2005  
not in the modification area
INSP-Sprinkler Rough-in7/21/20057/22/20057/22/2005PCANC
DetailsForrest France
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Alicia Pauley
Override - Parcel Holds1/1/19001/1/19007/21/2005  
Override - Parcel Holds1/1/19001/1/19007/21/2005  
Override - Parcel Holds  7/21/2005  
Inspection Record Card- Fire7/21/2005 7/21/2005 DONE
(F) Reprint permit  7/21/2005 DONE
Sprinkler Plan Check7/14/2005 7/20/2005 PASS
DetailsBill Alexander
Miscellaneous action  7/20/2005 DONE
2nd review taken to the permit desk for distributing. No Fee.
INSP-Sprinkler Rough-in7/13/20057/14/20057/14/2005PCANC
DetailsForrest France
Cancel inspection per contractor, not ready.
Plan resubmittals received  7/14/2005 DONE
INSP-Sprinkler Rough-in7/12/20057/13/20057/13/2005PCANC
DetailsForrest France
CONTACT MATT, R-IN. AFTER 3PM; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
Override - Parcel Holds  7/13/2005  
INSP-Sprinkler Rough-in7/12/20057/13/20057/12/2005PCANC
DetailsForrest France
CONTACT MATT. R-IN.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005PPART
DetailsForrest France
Rough-in at theatres 1,2,3,4,5,6,7 are good for cover, improper branch line hanger in theatre 1 repaired while on site. EQ 4 way bracing in theatre 2 and 6 to be amended so lateral and longitudinal connections at main are closer together. Proper head spacing to be verified when heads are installed in tile at final locations.
Issue permit  7/8/2005 DONE
Plan assigned to (Bill)6/28/2005 7/7/2005 DONE
Sprinkler Plan Check6/28/2005 7/7/2005 PART
DetailsBill Alexander
The data has been moved to a Word document attached to this case.
PLANS/APPL TAKEN TO FRONT DESK  7/7/2005 DONE
DetailsBill Alexander
Inspection Record Card- Fire7/7/2005 7/7/2005 DONE
Permit Ready to Issue  7/7/2005  
Telephone call  7/7/2005 DONE
left mess that permit is ready
Case Summary  6/28/2005  
Application received  6/28/2005