INSP-Final Inspection | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Forrest France
|
|
|
One horn/strobe device was relocated for correct coverage while on site, sample tube incorrectly installed was repaired while on site, all other items tested satisfactory. Fire alarm finaled.
|
INSP-Final Inspection | 10/14/2005 | 10/18/2005 | 10/18/2005 | A | CANC |
Forrest France
|
|
|
Cancel inspection per Grant, one heat pump is not operational at this time.
|
Issue and Print Permit | | | 8/11/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 6/30/2005 | | 8/5/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/5/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/5/2005 | | 8/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/5/2005 | | DONE |
|
|
|
Spoke with Terri and told her that this permit is ready & fees///8/5/05 10:20am BAS
|
Plan resubmittals received | | | 7/28/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 7/5/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Rob Ahten.
|
Application received | | | 6/30/2005 | | |
|
|
|
|
Case Summary | | | 6/30/2005 | | DONE |
|
|
|
|