INSP-Final Inspection | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PASS |
Forrest France
|
|
|
Permit finaled.
|
INSP-Alarm Testing | 8/12/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
Issue permit | | | 7/8/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 7/7/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/7/2005 | | 7/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2005 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees///7/7/05 9:31am BAS
|
Plan assigned to (Mary) | 6/30/2005 | | 7/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2005 | | DONE |
|
|
|
Request to John Lopez to define the wattage of the speakers, wattage calculation for the new voice evac amplifier and revised matrix to sound notification throughout the building, not in just the TI space.
|
Alarm Plan Check | | | 7/6/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/6/2005 | | DONE |
|
|
|
Received revised matrix, VEC battery and wattage calcs via fax.
|
Case Summary | | | 6/30/2005 | | DONE |
|
|
|
|
Application received | | | 6/30/2005 | | |
|
|
|
|