Permit NumberFIR05-00385
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 917 S LUSK ST
Project NameSPR KENETICS OH & PHASE 2 UG
Customer Number 
ePlanReview 
Description
KEYNETICS OFFICE (SHELL & CORE) - To install underground and overhead, Ordinary Group 1 and Light Hazard wet system with an extended supervised, electric pneumatic release, double interlock preaction system for a small area on the second floor, in a new 27,958-ft/2, three story, metal frame, exterior walled, concrete floored, metal roof decked, with a roof top mechanical equipment structure. Each floor is approximately 9,172-ft/2 with interior CMU walls around restrooms and stair enclosures. This building is fully fire sprinklered for story and area increase. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-02409.
*November 7, 2005 - Modification to a design submitted for demo existing wet pipe protection in the electrical room directly beneath the 2nd floor computer room.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/15/200512/15/200512/15/2005PPASS
DetailsForrest France
c/n items are complete, fire sprinkler permit finaled.
INSP-Sprinkler Rough-in/Hydro12/13/200512/14/200512/14/2005PDONE
DetailsForrest France
This duplicate inspection already called in has been completed, see c/n items listed.
INSP-Sprinkler Rough-in/Hydro12/13/200512/14/200512/14/2005APART
DetailsForrest France
Retest of the preaction system hydrostatic two hour test passed.
INSP-Sprinkler Rough-in12/13/200512/14/200512/14/2005APART
DetailsForrest France
Overhead is acceptable pending installation of missing escutcheons, ceiling tile, remove tape and paper at uprights where covered for painting, need heads in head box and wrench, perform forward flow, alarms, sign at bell.
INSP-Sprinkler Rough-in/Hydro12/13/200512/13/200512/13/2005PFAIL
DetailsTroy Cobbley
Pre-action hydro test failed.
INSP-Sprinkler Rough-in/Hydro12/12/200512/13/200512/13/2005APART
DetailsForrest France
Overhead hydrostatic test of the wet system passed inspection.
INSP-Sprinkler Rough-in/Hydro12/12/200512/13/200512/13/2005APART
DetailsForrest France
The 24 hr. air test for the preaction system passed.
INSP-Sprinkler Rough-in12/12/200512/12/200512/12/2005PPART
DetailsForrest France
First floor overhead rough-in is okay for cover at the grid ceiling areas only, began 24 hour air test at 9:30 am at 42psi.
CHANGE STATUS TO (ISS)  12/9/2005  
Telephone call  12/8/2005 DONE
called ###-#### and told Jeff that permit is ready and fees
Plan resubmittals received  12/8/2005 DONE
As-Built plan (1 set).
Sprinkler Plan Check11/9/2005 12/7/2005 PASS
DetailsBill Alexander
Plan assigned to (Bill)11/9/2005 12/7/2005 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/7/2005 DONE
Inspection Record Card- Fire12/7/2005 12/7/2005 DONE
Permit Ready to Issue  12/7/2005 DONE
INSP-Sprinkler Rough-in/Hydro12/1/200512/2/200512/2/2005APART
DetailsForrest France
2nd and 3rd floor only is okay for cover regarding rough-in, some sw and ssu heads are missing, various pendant heads are overspaced, sw heads are painted in some locations.
INSP-Sprinkler Rough-in11/30/200512/1/200512/1/2005PCANC
DetailsForrest France
Inspection to be rescheduled per agreement with Mike at ###-#### for 12/2 am.
Plan resubmittals received  11/9/2005 DONE
Permit Ready to Issue  11/8/2005 DONE
Inspection Record Card- Fire11/8/2005 11/8/2005 DONE
Telephone call  11/8/2005 DONE
Left message for Jeff Anderson that permit is ready & fees///11/8/05 9:05am BAS
Issue and Print Permit  11/8/2005 DONE
Plan assigned to (Bill)11/2/2005 11/7/2005 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  11/7/2005 DONE
Permit Ready to Issue  11/7/2005 DONE
Inspection Record Card- Fire11/7/2005 11/7/2005 DONE
Sprinkler Plan Check11/2/2005 11/7/2005 FAIL
DetailsBill Alexander
Resubmittal required addressing Review Comments:

2. Provide hydrant/fire sprinkler supply piping (details) which meets the minimum requirements of adopted codes. (BMC 7-01-50-901.2, IFC 105.4.2)

5. Designer provided a "cart blanc" data submittal on the preaction system:
2½" Supertrol Model H, D.I. Preaction Valve Assembly
2½" Supertrol D.I. Preaction Trim (option not identified)
Optional items installing:
Model 1 LAA-11T-M100X, 1/6 hp compressor w/2gal. Tank,
RP1001 Releasing Control Panel, (options not identified)
Alarm Annunciator,
Trouble Annunciator,
Smoke Detectors,
Pressure Maintenance Device
a. Trim package and Releasing Panel options were not identified. Provide clarification of packages incorporating.
b. It is assumed that Treasure Valley Fire Protection is including all other "options" addressed above. If any of the remaining options are not being installed, corrected submittals will be required addressing the changes.
(BMC 7-01-50-901.2, IFC 105.4.2)

16. All sectional details (reference 3 on FP-6) were not provided with dimensioning and/or not scaled. Architectural (A-5.3) plans included both? Provide dimensioning and/or scale for in sectional views for verification of elevations (hydraulic pressure losses). (BMC 7-01-50-901.2, IFC 105.4.2)

17. When resubmitting provided the correct fire permit and associated building permit numbers on the permit application.
INSP-Sprinkler Rough-in11/3/200511/3/200511/3/2005PPART
DetailsForrest France
The 3rd floor center common area hard lid area is acceptable for cover, also discussed coverage requirements for small room at perimeter and 2nd floor hard lid areas.
Plan resubmittals received  11/2/2005 PART
DetailsBill Alexander
INSP-Sprinkler Rough-in10/7/200510/7/200510/7/2005PFAIL
DetailsForrest France
Upright heads at first floor landings in both stairways are overspaced, upright head is missing above restroom 1st floor, hanger is missing on an armover above restroom 3rd floor, provide resubmittals reflecting added uprights and pipe layout changes at restrooms 1st, 2nd, and 3rd floors.
INSP-Conference10/4/200510/4/200510/4/2005PDONE
DetailsForrest France
On site discussion regarding sprinkler coverage requirements at stair landings and cloud ceiling areas.
INSP-Sprinkler Rough-in/Hydro8/8/20058/9/20058/9/2005APART
DetailsForrest France
UG fire supply line hydrostatic test for phase one and two of underground work passed inspection.
INSP-Supply line flush8/8/20058/9/20058/9/2005APART
DetailsForrest France
Phase two UG fire supply line flush is satisfactory.
INSP-Supply line flush8/8/20058/8/20058/8/2005PCANC
DetailsForrest France
Cancel inspection per Sam, not ready, will reschedule for tomorrow.
INSP-Sprinkler Rough-in/Hydro8/8/20058/8/20058/8/2005PCANC
DetailsForrest France
Cancel inspection per Sam with Treasure Valley Sprinkler.
Inspection Record Card- Fire8/4/2005 8/4/2005 DONE
Permit Ready to Issue  8/4/2005  
Telephone call  8/4/2005 DONE
left mess that permit is ready
Issue and Print Permit  8/4/2005 DONE
Plan assigned to (Bill)6/30/2005 8/3/2005 DONE
Sprinkler Plan Check7/25/2005 8/3/2005 PART
DetailsBill Alexander
1. No details addressing the connection of this hydrant to a supply which is secondary fire protection to the primary, fire sprinklers. Provide hydrant/fire sprinkler supply piping (details) which meets the minimum requirements of adopted codes. (BMC 7-01-50-901.2, IFC 105.4.2)

2. a. Trim package and Releasing Panel options were not identified. Provide clarification of packages invorproating.
b. It is assumed that Treasure Valley Fire Protection is including all other "options" addressed above. If any of the remaining options are not being installed, corrected submittals will be required addressing the changes.

3. Submittals are incomplete. The working plan submittal shall include the manufacturer's installation instructions/information for any specialty equipment, including descriptions, applications, and limitations, devices, etc. Provide data submittal on the manufacturers "electric risers" (if applicable), with model identified and referenced. If not incorporating this electric type risers, provide clearer details of a typical floor zone control incorporating in this building which includes all required devices and appurtenance. (BMC 7-01-50-901.2, IFC 105.4.2, NFPA 13-14.1.4)

4. All sectional details (reference 3 on FP-6) were not provided with dimensioning and/or not scaled. Architectural (A-5.3) plans included both? Provide dimensioning and/or scale for in sectional views for verification of elevations (hydraulic pressure losses). (BMC 7-01-50-901.2, IFC 105.4.2)

5. When resubmitting provided the correct fire permit and associated building permit numbers on the permit application.
PLANS/APPL TAKEN TO FRONT DESK  8/3/2005 DONE
DetailsBill Alexander
Sprinkler Plan Check6/30/2005 7/11/2005 FAIL
DetailsBill Alexander
The data has been moved to a Word document attached to this case.
Miscellaneous action  7/11/2005 DONE
8:05 am, took failed plans/documents to permit desk for returning and corrections.
Telephone call  7/11/2005 DONE
tlk to jeff anderson that his permit has failed and to picked up
Application received  6/30/2005