INSP-Final Inspection | 8/30/2005 | 9/2/2005 | 9/2/2005 | A | DONE |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 5:08:48 PM. Contact: ###-####.
|
DOC - Permit Finaled | | | 9/2/2005 | | DONE |
|
|
|
Verified input signal to FACP, control room and remote annunciator. Signal is a supervisory.
|
INSP-Final Inspection | 8/30/2005 | 8/30/2005 | 8/30/2005 | P | CANC |
Forrest France
|
|
|
No time to perform this inspection today. Orlen to reschedule for this friday per our agreement.
|
Issue and Print Permit | | | 7/19/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/1/2005 | | 7/13/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 7/13/2005 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2005 | | 7/13/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2005 | | DONE |
|
|
|
lft vm with ronnie zahm that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 7/11/2005 | | DONE |
|
|
|
Received 4th floor location plan.
|
Alarm Plan Check | | | 7/6/2005 | | FAIL |
|
|
|
Submittal does not include the FA location sheet for the actual temperature monitoring module. Phoned Charlie at Simplex and stated that a resubmittal was required. I would accept a location plan to add to the existing submittal.
|
Application received | | | 7/1/2005 | | |
|
|
|
|
Case Summary | | | 7/1/2005 | | |
|
|
|
|