INSP-Final Inspection | 9/28/2005 | 9/29/2005 | 9/29/2005 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, fire alarm finaled.
|
INSP-Final Inspection | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | PART |
Forrest France
|
|
|
System testing was satisfactory, will final permit when all covers have been removed from smoke detectors, a sign has been provided at the door to the FACP, the manual pull station is moved over to avoid obstruction by the adjacent door and re-tested. The missing strobe at first floor restroom was installed and tested while on site, keypad locations were added to the map at panel, all other items are satisfactory.
|
INSP-Final Inspection | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | CANC |
Forrest France
|
|
|
Cancel inspection per Patrick at ###-####, the final location for HVAC diffusers is not complete thus affecting smoke detector location, Patrick to reschedule when ready.
|
INSP-Final Inspection | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
Alarm Plan Check | 7/19/2005 | | 7/19/2005 | | PASS |
Troy Cobbley
|
|
|
Approved with comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/19/2005 | | 7/19/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/19/2005 | | DONE |
|
|
|
tlk to ken webster that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 7/19/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/14/2005 | | DONE |
|
|
|
|
Alarm Plan Check | 7/12/2005 | | 7/12/2005 | | FAIL |
|
|
|
Review comments faxed to Contractor.
|
Case Summary | | | 7/5/2005 | | DONE |
|
|
|
|
Application received | | | 7/5/2005 | | |
|
|
|
|
Plan assigned to (Mary) | 7/5/2005 | | | | |
|
|
|
|