INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | A | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Sprinkler Rough-in | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PASS |
Troy Cobbley
|
|
|
rough-in passed. Final head spacing will be checked at the final since not all of the pendants had been snapped into the t-bar. Could not get into the riser room to verify annual inspection on the sprinkler system
|
Telephone call | | | 7/19/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 7/18/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/18/2005 | | 7/18/2005 | | PASS |
Bill Alexander
|
|
|
Wall alternate used which designer missed which affected fire sprinkler design/installation.
|
Miscellaneous action | | | 7/18/2005 | | DONE |
|
|
|
Plan mod/supplement taken to permit desk for calling and distributing.
|
Plan assigned to (Bill) | 7/5/2005 | | 7/13/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/5/2005 | | 7/13/2005 | | PASS |
Bill Alexander
|
|
|
See field verification requirements in review comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2005 | | 7/13/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2005 | | DONE |
|
|
|
tlk to gerald ebeling ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 7/13/2005 | | DONE |
|
|
|
|
Application received | | | 7/5/2005 | | |
|
|
|
|