INSP-Final Inspection | 10/17/2005 | 10/20/2005 | 10/20/2005 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/27/2005 | 9/28/2005 | 9/28/2005 | A | CANC |
Troy Cobbley
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa darin cancelled
|
Issue permit | | | 8/26/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/4/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 8/4/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/4/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 8/4/2005 | | 8/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2005 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees///8/4/05 8:40am BAS
|
Plan assigned to (Mary) | 7/19/2005 | | 8/4/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/4/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2005 | | DONE |
|
|
|
Left a message for John, after discussion with Lee Rice, NFPA 90A is not included in the IMC. Therefore if he is comfortable with the design, let me know I'll process the permit.
|
Telephone call | | | 8/3/2005 | | DONE |
|
|
|
John Hatten, (HP) stated that he was comfortable with the removal of the duct detectors on the supply side of the HVAC units. Please process the permit.
|
Telephone call | | | 8/1/2005 | | DONE |
|
|
|
John Hatten called back, I questioned the size of the units and he was going to look into it.
|
Telephone call | | | 7/28/2005 | | DONE |
|
|
|
Left a message for John Hatten to call regarding the actual scope of work.
|
Application received | | | 7/19/2005 | | |
|
|
|
|
Case Summary | | | 7/19/2005 | | DONE |
|
|
|
|