PROSOURCE WHOLESALE CARPET & WAREHOUSE - To install approximately 85'-0" of 6" C-900 PVC connected at the properly line in Allante Place, traveling northeast at a 45° approximately 63'-0" then north approximately 20'-0", under the footing and up through the floor with 6" Ductile Iron to approximately 6" above the finished floor with a 6"x 11 flange adapter and blank flange. Fire flow requires this building to be constructed as a Type III-B building. (This building will be partially fire sprinklered in the high pile storage areas). The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-01065.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/1/200511/1/200511/1/2005PPASS
DetailsTroy Cobbley
Sprinkler permit finaled
INSP-Supply line flush9/23/20059/26/20059/26/2005PPASS
DetailsTroy Cobbley
Underground supply line flush passed
INSP-Sprinkler Rough-in/Hydro8/11/20058/12/20058/12/2005PPASS
DetailsTroy Cobbley
Underground supply piping is ok to cover
Issue and Print Permit  8/2/2005 DONE
Plan assigned to (Bill)7/21/2005 8/1/2005 DONE
Sprinkler Plan Check7/21/2005 8/1/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  8/1/2005 DONE
Inspection Record Card- Fire8/1/2005 8/1/2005 DONE
Permit Ready to Issue  8/1/2005 DONE
Telephone call  8/1/2005 DONE
lft ms with secretary for randy ###-#### that permit and fees are ready to be picked up
Case Summary  7/21/2005 DONE
Application received  7/21/2005