INSP-Final Inspection | 5/18/2006 | 5/18/2006 | 5/18/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | DONE |
Troy Cobbley
|
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
INSP-Supply line flush | 8/24/2005 | 8/26/2005 | 8/26/2005 | A | PART |
Forrest France
|
|
|
Underground hydrostatic test passed within allowabe leakage requirements, the flush performed after hydro test was satisfactory.
|
INSP-Sprinkler Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply line is good for cover, per contractor the PIV has been relocated to avoid a sidewalk, this change to be reflected on as-built drawings.
|
Issue and Print Permit | | | 8/5/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/26/2005 | | 8/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/26/2005 | | 8/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/4/2005 | | 8/4/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2005 | | DONE |
|
|
|
lft ms with secretary for john venche ###-#### that permit and fees are ready to be picked up
|
Application received | | | 7/26/2005 | | |
|
|
|
|