INSP-Final Inspection | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Forrest France
|
|
|
Per inspection completed by M.Timmerman, fire alarm work is acceptable, inspeciton passed, permit finaled.
|
INSP-Conference | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | DONE |
Forrest France
|
|
|
On site discussion regarding work in progress for the permit.
|
Issue and Print Permit | | | 8/9/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/28/2005 | | 8/9/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/5/2005 | | PASS |
|
|
|
Red-line comments
1. Ceiling Height?
2. Is there proper audibility?
Approved pending PDS Fire Inspector field verification. See comments above and on drawings.
|
Application received | | | 7/28/2005 | | |
|
|
|
|
Inspection | 11/1/2006 | 11/1/2006 | | | |
|
|
|
Fire Alarm Inspection A/V by Mike Timmerman 11/1/2006. Called Forrest let him know this permit passed.
|