INSP-Final Inspection | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply permit finaled.
|
INSP-Supply line flush | 1/31/2006 | 2/1/2006 | 2/1/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush is satisfactory.
|
INSP-Supply line flush | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | CANC |
Forrest France
|
|
|
To be rescheduled per agreement with contractor per conversation.
|
INSP-Sprinkler Rough-in/Hydro | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | PART |
Forrest France
|
|
|
UG supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 9/9/2005 | 9/12/2005 | 9/12/2005 | P | PART |
Forrest France
|
|
|
The remainder of the UG fire supply line installation is acceptable, okay to cover.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/9/2005 | | |
|
|
|
fire inspection
|
INSP-Sprinkler Rough-in | 8/24/2005 | 8/25/2005 | 8/25/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply line riser and stub out are good for cover, the top of pipe to grade at top of stem wall is 4'-5", will verify at next inspection min. depth of bury has been met.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/24/2005 | | |
|
|
|
|
Issue and Print Permit | | | 8/3/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/29/2005 | | 8/2/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/29/2005 | | 8/2/2005 | | PASS |
Bill Alexander
|
|
|
Faxed Permit Application
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/2/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/2/2005 | | 8/2/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/2/2005 | | DONE |
|
|
|
Spoke with Jeff Anderson and told him that permit is ready & fees///8/2/05 4:02pm BAS
|
Application received | | | 7/29/2005 | | |
|
|
|
|