INSP-Final Inspection | 3/1/2006 | 3/1/2006 | 3/1/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, items on c/n are complete.
|
INSP-Sprinkler Rough-in/Hydro | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PART |
Forrest France
|
|
|
The remainder of overhead rough-in is good for cover, noted to contractor that any existing defficiencies in the adjacent area shall be corrected.
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2006 | 1/17/2006 | 1/17/2006 | A | PART |
Troy Cobbley
|
|
|
See city approved plans for areas inspected and areas left to inspect
|
Issue permit | | | 10/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/14/2005 | | 10/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/14/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Sprinkler Plan Check | 9/27/2005 | | 10/13/2005 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 9/27/2005 | | 10/13/2005 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/27/2005 | | |
|
|
|
|
Issue permit | | | 8/10/2005 | | |
|
|
|
|
Telephone call | | | 8/9/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 8/9/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/5/2005 | | 8/8/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/8/2005 | | 8/8/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/2/2005 | | 8/8/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/5/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/2/2005 | | 8/4/2005 | | FAIL |
Bill Alexander
|
|
|
Need the following minimum information
Emailed to Jeff T. Anderson 3:01pm
Response came on 3:38pm
1. With the current history of SLRMC, (including this associated BLD number and when it was issued [10/4/2001]), a good look at the anticipated time frame after removal of this protection to when this new revised fire sprinkler piping will be re-installed and functional.
2. The SLRMC Fire Prevention Program Superintendent must develop an approved prefire plan in cooperation with the Fire Chief which shall be addressed prior to fire permit release. ( IFC 1408.1, 1408.2, 1408.3, 1408.4)
3. Upon having the above information, obtain approval from the Fire Chief in an approved documented form.
|
Miscellaneous action | | | 8/3/2005 | | DONE |
|
|
|
Need the following minimum information
Emailed to Jeff T. Anderson 3:01pm
Response came on 3:38pm
1. With the current history of SLRMC, (including this associated BLD number and when it was issued [10/4/2001]), a good look at the anticipated time frame after removal of this protection to when this new revised fire sprinkler piping will be re-installed and functional.
2. The SLRMC Fire Prevention Program Superintendent must develop an approved prefire plan in cooperation with the Fire Chief which shall be addressed prior to fire permit release. ( IFC 1408.1, 1408.2, 1408.3, 1408.4)
3. Upon having the above information, obtain approval from the Fire Chief in an approved documented form.
|
Application received | | | 8/2/2005 | | |
|
|
|
|