INSP-Final Inspection | 4/4/2006 | 4/4/2006 | 4/4/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 3/29/2006 | 3/31/2006 | 3/31/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | FAIL |
Troy Cobbley
|
|
|
No review notes on site. Also contractor needs to provide revised drawings which include the two additional duct smoke detectors and the deletion of the ceiling mount a/v's that were located in the existing sanctuary. No items tested.
|
INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
|
INSP-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 | P | FAIL |
Troy Cobbley
|
|
|
See back of review comments for a list of items needing correction. This list is only partial as the inspection is not complete. All signals need to be redone since the monitoring account was not set up. An additional pull station is required.
|
FIR-Aging Inspection | 12/30/2005 | 12/30/2005 | 12/30/2005 | | NR |
Troy Cobbley
|
|
|
work in progress
|
Permit Ready to Issue | | | 9/30/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/30/2005 | | 9/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2005 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees///9/30/05 9:30am BAS
|
Issue and Print Permit | | | 9/30/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/29/2005 | | DONE |
|
|
|
Received revised matrix from Jon Van Stone.
|
Plan assigned to (Mary) | 8/9/2005 | | 9/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2005 | | DONE |
|
|
|
Spoke to Jon Van Stone regarding ceiling heights in the sanctuary, and the matrix needs to be revised. He will fax one.
|
Plan resubmittals received | | | 9/23/2005 | | DONE |
|
|
|
Received e-mail from John McCarthy defining the communicaiton process for the FACP (DACT, 2 phone lines)
|
Telephone call | | | 9/14/2005 | | DONE |
|
|
|
Spoke to John McCarthy, (Benchmark Construction) regarding the FA permit application still did not include the required "off-site alarm supervision" checked not the type defined. The plans include a DACT for the FACP so the assumed design is that two phone lines will be connected to the FACP. John stated that the church already has a security system and they wanted to use the same monitoring. He has a meeting today and will call me back tomorrow.
I told him that if they were not going to utilize the FACP with the DACT that they would need to resubmit the design to implement whatever is in place to use for the monitoring and they will need to give the monitoring company's information to me.
|
Plan resubmittals received | | | 9/7/2005 | | DONE |
|
|
|
|
Case Summary | | | 9/7/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/16/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Benchmark, E2Co and Fibertechian
|
Application received | | | 8/9/2005 | | |
|
|
|
|
Case Summary | | | 8/9/2005 | | DONE |
|
|
|
|