INSP-Sprinkler Rough-in/Hydro | 9/19/2005 | 9/19/2005 | 9/21/2005 | P | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 9/19/2005 at 10:04:18 AM. Contact: ###-####.
|
INSP-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 | P | CANC |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2005 | 9/13/2005 | 9/13/2005 | P | PART |
Troy Cobbley
|
|
|
Office area sprinkler piping is ok to cover. Still need uprights installed along tenant separation wall and the riser tagged. Wrong SIN number for pendants but per bill no need to resubmit.
|
Inspection Record Card- Fire | 8/30/2005 | | 8/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2005 | | DONE |
|
|
|
tlk to receptionist ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 8/30/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/16/2005 | | 8/29/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/29/2005 | | 8/29/2005 | | DONE |
|
|
|
|
Application received | | | 8/16/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 8/16/2005 | | | | |
|
|
|
|