INSP-Final Inspection | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | DEFR |
Forrest France
|
|
|
Final pending the completion and final of the shell fire sprinkler permit FIR05-00372.
|
INSP-Final Inspection | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Final Inspection | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | PART |
Forrest France
|
|
|
Fire sprinkler is acceptable when shell system is operational and approved.
|
INSP-Final Inspection | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 7:58:44 AM. Contact: ###-####. canc kirk
|
INSP-Final Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | P | PART |
Forrest France
|
|
|
Heads and escutcheons have been installed, ready for final when fire pump for water supply and riser are complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | PART |
Forrest France
|
|
|
Branch line directly above electrical panel needs to be relocated, the remainder of overhead rough-in is good for cover.
|
Override - Parcel Holds | | | 9/23/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 9/23/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/23/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 9/23/2005 | | 9/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/23/2005 | | DONE |
|
|
|
Spoke with Catherine and told her that permit is ready & fees///9/23/05 9:00am BAS
|
Override - Parcel Holds | | | 9/23/2005 | | |
|
|
|
|
Issue and Print Permit | | | 9/23/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/6/2005 | | 9/22/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2005 | | DONE |
|
|
|
|
Case Summary | | | 9/6/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2005 | | DONE |
|
|
|
tlk to receptionist ###-#### that permit failed needs to be returned
|
Sprinkler Plan Check | 8/17/2005 | | 8/29/2005 | | FAIL |
Bill Alexander
|
|
|
1. This first floor tenants fire sprinklers installing, existing head layout, etc., is not the same fire sprinklers and layout verified and approved in the original (ongoing FIR05-00372) shell permit. Provide a design that is compatible with the approved original shell or provide reverification of a design incorporating in this tenant space. (IFC 105.4.2, BMC 7-01-50 IFC 901.2)
2. Correct all compass reading on the plan that are incorrect, to help clarify the correct location of tenant work. (IFC 105.4.2, BMC 7-01-50 IFC 901.2)
3. Any hanger attaching to the pad deck in this tenant will require metal and concrete, not just metal decking. Revise hanger to match correct listed attachments. (IFC 105.4.2, BMC 7-01-50 IFC 901.2)
|
Miscellaneous action | | | 8/29/2005 | | DONE |
|
|
|
Returned documents/plan to permit desk for returning.
|
Application received | | | 8/17/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 8/17/2005 | | | | |
|
|
|
|