INSP-Final Inspection | 12/5/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Forrest France
|
|
|
Resubmittals have been reviewed and verified, c/n items are complete, fire sprinkler permit finaled.
|
Sprinkler Plan Check | 12/2/2005 | | 12/2/2005 | | PASS |
|
|
|
Resubmittals approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/2/2005 | | 12/2/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/2/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2005 | | DONE |
|
|
|
called ###-#### and told John that permit is ready to pick up and no fees
|
CHANGE STATUS TO (ISS) | | | 12/2/2005 | | DONE |
|
|
|
no fee on permit
|
Miscellaneous action | | | 12/1/2005 | | DONE |
|
|
|
Completed plan review of the resubmittals. There are still issues preventing issuing of the plans. Per my phone conversation with the fire sprinkler contractor, he will meet me this afternoon or first thing in the morning with the addition information/clarifications required for approvals.
|
INSP-Final Inspection | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | PART |
Forrest France
|
|
|
Approval pending resubmittals reflecting the required changes.
|
INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | FAIL |
Troy Cobbley
|
|
|
Resubmittals not approved yet. No inspection performed.
|
Plan resubmittals received | | | 11/7/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | FAIL |
Forrest France
|
|
|
Provide resubmittals reflecting items 1 thru 9 on plan review notes, attatched outside mechanical room is not shown on plans, missing longitudinal brace on 21/2 " main, need 200 degree head in upstairs mech room and janitors room 1st floor, install relief valve at riser, need 911 sign, install head cage at SW in mech room, not all items reviewed at this time.
|
INSP-Final Inspection | 10/28/2005 | 10/31/2005 | 10/31/2005 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed inspection.
|
INSP-Supply line flush | 10/17/2005 | 10/18/2005 | 10/18/2005 | A | PART |
Forrest France
|
|
|
Underground fire supply line flush is satisfactory.
|
Permit Ready to Issue | | | 9/7/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/7/2005 | | 9/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2005 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees///9/7/05 9:20am BAS
|
Issue and Print Permit | | | 9/7/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/19/2005 | | 9/6/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/19/2005 | | 9/6/2005 | | PART |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/1/2005 | | DONE |
|
|
|
Requested by letter (received 6/1/2005) early start.
|
Application received | | | 8/19/2005 | | |
|
|
|
|
Case Summary | | | 8/19/2005 | | DONE |
|
|
|
|