INSP-Final Inspection | 3/19/2008 | 3/19/2008 | 3/20/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler modifications in the south tower second floor at the cafeteria are complete.
|
Override - Parcel Holds | 2/4/2008 | 1/1/1900 | 2/4/2008 | | |
|
|
|
not related
|
INSP-Sprinkler Rough-in | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Troy Cobbley
|
|
|
The fourth floor piping at the connection between the north tower and the central tower is ok to cover.
|
INSP-Sprinkler Rough-in | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PART |
Troy Cobbley
|
|
|
The piping at the 5th floor connection between the north tower and the central tower is ok to cover
|
INSP-Final Inspection | 10/18/2007 | 10/19/2007 | 10/19/2007 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission. The temporary occupancy is for only the areas as agreed upon by McCarthy Construction, Boise Fire Dept. and the Building Department. These areas include the basement, 1st floor, 2nd floor, 3rd floor, 6th floor, 7th floor and penthouse. A fire watch is to remain on the 6th and 7th floors.
|
INSP-Final Inspection | 10/15/2007 | 10/15/2007 | 10/19/2007 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Final Inspection | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | PART |
Troy Cobbley
|
|
|
This inspection was actually for the eighth and ninth floors. They are ready for final when the time comes.
|
INSP-Final Inspection | 10/17/2007 | 10/17/2007 | 10/18/2007 | P | CANC |
Troy Cobbley
|
|
|
overbooked
|
INSP-Sprinkler Rough-in | 10/12/2007 | 10/15/2007 | 10/15/2007 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test for 7th and 8th floors passed.
|
INSP-Final Inspection | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Troy Cobbley
|
|
|
The fourth and fifth floor sprinkler systems are ready to final except the alarm interconnections need tested.
|
CHANGE STATUS TO (ISS) | | | 10/12/2007 | | DONE |
|
|
|
still working the different not final yet according rick
|
INSP-Sprinkler Rough-in | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PART |
Forrest France
|
|
|
OK to cover 9th floor eyebrow
|
INSP-Sprinkler Rough-in | 10/10/2007 | 10/10/2007 | 10/10/2007 | P | PASS |
Troy Cobbley
|
|
|
The north half of the 9th floor is ok to cover except the rooms in the "eye brow"
|
INSP-Sprinkler Rough-in | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | PASS |
Troy Cobbley
|
|
|
The south half of the 9th floor is ok to cover.
|
INSP-Sprinkler Rough-in | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Troy Cobbley
|
|
|
The remaining piping on the 8th floor is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/2/2007 | 10/3/2007 | A | PASS |
Troy Cobbley
|
|
|
The south half of the 8th floor sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 10/1/2007 | 10/1/2007 | 10/2/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the locations on the 8th floor south half where the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Troy Cobbley
|
|
|
The two sprinkler heads and related sprinkler piping located above the "rulon" ceiling on the 9th floor.
|
INSP-Sprinkler Rough-in | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | PASS |
Troy Cobbley
|
|
|
The piping on the second floor of the south tower is ok to cover.
|
INSP-Sprinkler Rough-in | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | CANC |
Troy Cobbley
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
INSP-Sprinkler Rough-in | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PASS |
Troy Cobbley
|
|
|
Fifth floor sprinkler piping is ok to cover.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/18/2007 | | 9/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/18/2007 | | DONE |
|
|
|
tlk to jeff packham ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/18/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/18/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/31/2007 | | 9/17/2007 | | PASS |
|
|
|
3 additional heads approved by bryan johnson
|
INSP-Sprinkler Rough-in | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PASS |
Troy Cobbley
|
|
|
The electrical wiring has been removed from the sprinkler piping on the fourth floor.
|
INSP-Final Inspection | 9/10/2007 | 9/11/2007 | 9/11/2007 | P | FAIL |
Troy Cobbley
|
|
|
It appears at this time that the areas covered under phase one are complete. This includes the basement, first, second, third, sixth, seventh and penthouse floors. A portion of the south tower where it connects to the new central tower is still under construction but is separated from the central tower by walls and doors.
|
INSP-Final Inspection | 9/7/2007 | 9/10/2007 | 9/11/2007 | A | FAIL |
Troy Cobbley
|
|
|
Not all work is complete
|
INSP-Final Inspection | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | FAIL |
Troy Cobbley
|
|
|
The east system of the second floor is ready to final.
|
INSP-Final Inspection | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | FAIL |
Troy Cobbley
|
|
|
The west half of the second floor sprinkler system is ok to final when the missing head in the electrical closet is installed.
|
INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | DONE |
Troy Cobbley
|
|
|
The basement and first floors of the central tower are basically ready for final. The basement has a couple of small issues. In a shower a cabinet has been installed and is blocking sprinkler coverage and in the east stairwell a hanger has been removed and the head under the stairs still has tape on it.
|
INSP-Final Inspection | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | FAIL |
Troy Cobbley
|
|
|
We had a key for access but ceiling tile was missing from every room. The inspection was stopped after the fifth room. This was on the first floor.
|
INSP-Final Inspection | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | CANC |
Troy Cobbley
|
|
|
See inspection request for this morning for inspection notes.
|
INSP-Final Inspection | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | FAIL |
Troy Cobbley
|
|
|
There are many rooms that are missing ceiling tile and are locked with no access to inspect. Project was not ready for inspection.
|
Plan resubmittals received | | | 8/31/2007 | | |
|
|
|
received 1 app, with each set of "4" books with comments & 1 letter of transmittal with each set & also "4" sets of plans with each sheet FP1, FP2, FP3, FP4, FP5, FP6, FP7, FP8, FP9, FP10, FP11, FP12, FP13, FP14, FP15, FP16, FP17, FP18, FP19, FP20, FP21, FP22, FP23, FP24, FP25, FP26, FP27, FP28, FP29, FP30, & FP31--plans taken to Scott Arellano
|
INSP-Final Inspection | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Final Inspection | 8/29/2007 | 8/29/2007 | 8/29/2007 | P | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
INSP-Sprinkler Rough-in | 8/28/2007 | 8/28/2007 | 8/28/2007 | P | PASS |
Troy Cobbley
|
|
|
The overhead piping in the emergency entrance corridor is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Penthouse hydro test passed.
|
INSP-Sprinkler Rough-in | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved drawings for the area on the 3rd floor that is ok to cover. Also the rough-in inspection for the penthouse is passed except for areas marked on the plans.
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | PASS |
Troy Cobbley
|
|
|
6th and 7th floor hydro tests passed
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
Troy Cobbley
|
|
|
Third floor hydro test passed
|
INSP-Sprinkler Rough-in | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas on the fourth floor where the piping is ok to cover
|
INSP-Sprinkler Rough-in | 8/14/2007 | 8/14/2007 | 8/14/2007 | P | FAIL |
Troy Cobbley
|
|
|
The piping layout in the existing areas does not match the approved plans. Starter pieces are shown as 1" where as the actual piping has 1 1/4" piping. There are branchlines where none are shown. Plans need to be resubmitted to reflect the actual conditions.
|
INSP-Sprinkler Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PASS |
Troy Cobbley
|
|
|
See the resubmitted fire sprinkler plans for locations where the reconfigured piping is approved for cover.
|
INSP-Sprinkler Rough-in | 8/10/2007 | 8/10/2007 | 8/10/2007 | A | PART |
Forrest France
|
|
|
OH rough-in is approved as noted for shell areas on the 6th and 7th floors see sheets FP 22,23,24,25 on stamped resubmittals, three rooms as noted on each floor no access provided, one area each floor needs to have the temp. walls removed to eliminate obstruction issues for shell system protection.
|
INSP-Sprinkler Rough-in | 8/8/2007 | 8/9/2007 | 8/10/2007 | A | PART |
Forrest France
|
|
|
OH fire sprinklers are good for cover at the east elevator lobby roulon ceiling 5th floor as circled on approved resubmittals.
|
INSP-Sprinkler Rough-in | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | CANC |
Troy Cobbley
|
|
|
Not enough time to perform inspection today. Rick said he would reschedule
|
Sprinkler Plan Check | 8/7/2007 | | 8/7/2007 | | PASS |
|
|
|
Fire Sprinklers review by Bryan Johnson
|
Inspection Record Card- Fire | 8/7/2007 | | 8/7/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2007 | | DONE |
|
|
|
tlk to jeff jacfkham ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/7/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/7/2007 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the locations where sprinkler piping can be covered on the second and fourth floors.
|
INSP-Sprinkler Rough-in | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping isok to cover.
|
INSP-Sprinkler Rough-in | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Troy Cobbley
|
|
|
See the third floor city approved drawings for the piping that is ok to cover.
|
INSP-Sprinkler Rough-in | 7/24/2007 | 7/24/2007 | 7/24/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the sprinkler piping that is ok to cover on the second floor north tower corridor.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Troy Cobbley
|
|
|
The hydro test of the east and west systems of the second floor has passed.
|
INSP-Sprinkler Rough-in/Hydro | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PASS |
Troy Cobbley
|
|
|
The remaining areas of the central tower 2nd floor are ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test of the west half of the first floor system passed.
|
INSP-Sprinkler Rough-in | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional areas on the second floor where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | PASS |
Troy Cobbley
|
|
|
The 2" fill line to the secondary storage tank was flushed. Also see the city approved plans for corridors and rooms on the second floor and first floor where piping is ok to cover. I also looked at the piping that will be above the Rulon ceiling in the first floor elevator lobby but did not give the ok to cover since this area has been resubmitted.
|
Meeting | | | 7/11/2007 | | DONE |
|
|
|
Meeting with Jeff Packhm, TVGP and Bryan Johnson, at Jeff's request, to discuss/explain the latest plan modifications that were resubmitted yesterday. He indicated there will probably be still another "as built" revision, but this one should cover the areas where the work is presently ready for inspection.
|
INSP-Sprinkler Rough-in | 7/6/2007 | 7/9/2007 | 7/10/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground fill line to the secondary storage tank is ok to cover.
|
Plan resubmittals received | | | 7/9/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2007 | 7/2/2007 | 7/2/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the second floor elevator lobby rulon ceiling is ok to cover
|
INSP-Sprinkler Rough-in | 6/28/2007 | 6/28/2007 | 6/29/2007 | P | PASS |
Troy Cobbley
|
|
|
The secondary water supply discharge piping is ok to rebury. Overall 3' of pipe has been added with the same fittings. This work was done due to a new column has been added.
|
INSP-Sprinkler Rough-in | 6/19/2007 | 6/19/2007 | 6/20/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the location on the second floor and third floor where piping is ok to cover. It appears all of the pendant heads installed in the restrooms have been painted and will need replaced.
|
INSP-Sprinkler Rough-in | 6/15/2007 | 6/18/2007 | 6/18/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the piping above the hardlids on the 9th floor which is ok to cover.
|
INSP-Sprinkler Rough-in | 6/13/2007 | 6/13/2007 | 6/14/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the areas where piping can be covered.
|
INSP-Sprinkler Rough-in | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the 1st and 2nd floor areas that the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas where piping is ok to cover
|
INSP-Sprinkler Rough-in | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the second floor, south tower, ASU restrooms are ok to cover
|
INSP-Sprinkler Rough-in | 5/22/2007 | 5/23/2007 | 5/23/2007 | A | PART |
Forrest France
|
|
|
The first floor lobby grid ceiling areas next to the donor walls are approved for cover, noted two heads spaced beyond max. allowabe distance- contractor to relocate one head to eliminate this problem.
|
INSP-Sprinkler Rough-in/Hydro | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Forrest France
|
|
|
Hydrostatic testing for the NW standpipe completed satisfactory, also approved for cover the 2nd floor mezzanine and 1st floor lobby grid ceiling areas as red lined and initialed on stamped plans.
|
INSP-Sprinkler Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PASS |
Troy Cobbley
|
|
|
The remaining hardlids on the eigth floor are ok to cover. Also the piping under the first floor stairs is ok to cover
|
INSP-Sprinkler Rough-in | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PASS |
Troy Cobbley
|
|
|
Mission Corridor sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2007 | 5/8/2007 | 5/9/2007 | A | PASS |
Troy Cobbley
|
|
|
Basement of the central tower hydro test passed.
|
INSP-Sprinkler Rough-in | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping located in the basement and the eighth floor that is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the location at the main entrance where the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 4/25/2007 | 4/26/2007 | 4/27/2007 | A | CANC |
Troy Cobbley
|
|
|
Inspection is to be rescheduled
|
INSP-Sprinkler Rough-in | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for areas on the eigth floor where the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the ceiling in Mission Spec. is ok to cover. Also the piping above the outside main canopy is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2007 | 3/28/2007 | 3/28/2007 | A | PART |
Forrest France
|
|
|
Fire sprinklers are approved for cover at the 1st floor chapel and chaplains office, also reinspected 5th floor RR which was missing a head and one hanger at an arm-over above a hard lid.
|
INSP-Sprinkler Rough-in | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for first floor and fifth floor areas where the piping is ok to cover
|
INSP-Sprinkler Rough-in | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the location where the piping on the third floor is not ok to cover. All other areas on the third floor are ok to cover
|
INSP-Sprinkler Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Troy Cobbley
|
|
|
see the city approved plans for locations on the 3rd floor that are ok to cover
|
INSP-Sprinkler Rough-in | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations of piping above hardlids that is approved for cover
|
INSP-Sprinkler Rough-in | 3/1/2007 | 3/2/2007 | 3/2/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the piping above the 5th floor hardlids that is ok to cover.
|
INSP-Sprinkler Rough-in | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Troy Cobbley
|
|
|
9th floor sprinkler rough-in passed.
|
INSP-Sprinkler Rough-in | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the piping above hardlids is ok to cover.
|
INSP-Sprinkler Rough-in | 2/8/2007 | 2/8/2007 | 2/9/2007 | P | PASS |
Troy Cobbley
|
|
|
The remaining south half of the 8th floor sprinkler system rough-in passed. Drops will still need to be inspected.
|
INSP-Sprinkler Rough-in | 1/31/2007 | 2/1/2007 | 2/1/2007 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the portion of the 8th floor that rough-in has passed.
|
INSP-Sprinkler Rough-in | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for piping on the first floor that is ok to cover.
|
INSP-Sprinkler Rough-in | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping in operating rooms 5 through 12 are ok to cover. Also see plans for piping above hardlids in lobby that is ok to cover as well.
|
INSP-Sprinkler Rough-in | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler is approved for cover at operating rooms 2, 3, and 4, second floor as marked on approved plans.
|
INSP-Sprinkler Rough-in | 1/5/2007 | 1/8/2007 | 1/8/2007 | A | PASS |
Troy Cobbley
|
|
|
See city approved plans for additional areas where the piping located above hardlids can be covered on the 2nd, 3rd and 4th floors.
|
INSP-Sprinkler Rough-in | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the remaining hardlids on the fourth floor is ok to cover and the remaining piping on the fifth floor that needed a rough-in inspection has passed.
|
Telephone call | | | 12/20/2006 | | DONE |
|
|
|
Telcon from Jeff Packham, TVFP. I approved adding 2 spk's in stair tower (at to and bottom) as "field modification" with 2 sets of "as built" plans for Fire Inspector. Also approved supplying the lower sprinkler head from the 3rd floor wet system as the 1st and 2nd floor systems are "dry" system, with condition that the fire alarm annunciator for 3rd sprinkler flow displays "3rd flr and stairway".
|
INSP-Sprinkler Rough-in | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Troy Cobbley
|
|
|
Piping located in the folding door pockets in the auditorium is ok to be covered.
|
INSP-Sprinkler Rough-in | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Pendants located in the soffets in auditorium are ok to cover.
|
INSP-Sprinkler Rough-in | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Flow of the most remote standpipe passed. Actual flow was 1,292 gallons.
|
INSP-Alarm Testing | 12/8/2006 | 12/11/2006 | 12/11/2006 | P | CANC |
Troy Cobbley
|
|
|
Wrong type of inspection called in.
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PASS |
Troy Cobbley
|
|
|
The hydro test for the north tower 6th floor mechanical area is passed.
|
INSP-Sprinkler Rough-in | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the piping that has been marked as inspected with todays date. This inspection was not for any drops or armovers. Three hangers had been taken off and will need to be re-installed. They have been marked on the prints.
|
INSP-Sprinkler Rough-in | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations on 4th floor where piping is ok to cover in the hardlid areas.
|
INSP-Sprinkler Rough-in | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations in the basement that the ceiling tile can be installed.
|
INSP-Sprinkler Rough-in | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations/rooms where piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | PASS |
Troy Cobbley
|
|
|
Standpipe hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request for an AG hydrostatic test of the 1st floor east wing which passed.
|
INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | PART |
Forrest France
|
|
|
OH rough-in at the 1st floor north tower corridor is okay to cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2006 | 10/31/2006 | 10/31/2006 | A | PART |
Forrest France
|
|
|
Inspection for overhead cover at the drop ceilings in the 1st floor corridor to the north tower and the hard lid on the 3rd floor stair tower #4 landing are acceptable for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | PASS |
Troy Cobbley
|
|
|
Rough-in for the standpipe in stairwells #2 and #4 passed
|
INSP-Sprinkler Rough-in | 10/20/2006 | 10/20/2006 | 10/20/2006 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas on the first floor that are ok for ceiling installation.
|
INSP-Sprinkler Rough-in/Hydro | 10/10/2006 | 10/10/2006 | 10/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Inspection was for the covering of sprinkler piping in the basement, second and third floors. See city approved plans for locations..
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2006 | 10/5/2006 | 10/6/2006 | A | PASS |
Troy Cobbley
|
|
|
Witnessed fire pump certification by the manufacturer
|
INSP-Sprinkler Rough-in | 10/2/2006 | 10/3/2006 | 10/3/2006 | A | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations of the sprinkler piping that is ok to cover
|
INSP-Sprinkler Rough-in | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | FAIL |
Troy Cobbley
|
|
|
Inspected east area of the first floor. Ok to cover when the fire alarm wire has been removed from the sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2006 | 9/12/2006 | 9/12/2006 | P | PART |
Troy Cobbley
|
|
|
Rough in Inspection for the remaining areas of the 4th floor new tower is passed except for there are numerous areas where the hangers and piping have been removed by other contractors. Prior to final rough-in being passed another inspection will be required to verify everything has been corrected.
|
INSP-Sprinkler Rough-in | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the portion of the 4th floor rough-in that was inspected and passed today
|
INSP-Sprinkler Rough-in | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PASS |
Troy Cobbley
|
|
|
The pendant sprinkler piping in the corridor in the basement that connects the mechanical room to the south tower is ok to cover. The third floor east stair tower piping above the ceiling is ok to cover.
|
INSP-Sprinkler Rough-in | 8/29/2006 | 8/30/2006 | 8/30/2006 | P | PASS |
Troy Cobbley
|
|
|
forward flow test passed
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Troy Cobbley
|
|
|
Hydro test of the west standpipe passed and can be covered in the first floor and basement walls.
|
INSP-Sprinkler Rough-in/Hydro | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Troy Cobbley
|
|
|
Hydro tests for the supply and basementt passed except for the standpipe
|
INSP-Sprinkler Rough-in/Hydro | 8/25/2006 | 8/25/2006 | 8/25/2006 | P | PART |
Troy Cobbley
|
|
|
All of the hydro tests failed except for the fdc piping
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2006 | 8/22/2006 | 8/22/2006 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping in the fire command center is ok to cover.
|
INSP-Supply line flush | 8/21/2006 | 8/22/2006 | 8/22/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2006 | 8/21/2006 | 8/21/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in | 8/11/2006 | 8/14/2006 | 8/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Third floor rough-in passed. Still need to have the arm overs inspected before coverup.
|
INSP-Sprinkler Rough-in | 8/10/2006 | 8/11/2006 | 8/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Rough-in for the branchline and main piping is now complete in the basement and first floors. The areas in question were addressed in the resubmittals. A rough-in inspection was done for the second floor main and branchline piping which passed. Armovers will still need to be inspected prior to cover up in basement, first and second floors.
|
INSP-Sprinkler Rough-in | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PASS |
Troy Cobbley
|
|
|
Breakdown room is ok to cover
|
INSP-Sprinkler Rough-in | 8/3/2006 | 8/3/2006 | 8/3/2006 | P | PART |
Forrest France
|
|
|
UG connection for remote FDC passed inspection for cover.
|
CHANGE STATUS TO (ISS) | | | 7/25/2006 | | |
|
|
|
picked up plans
|
(F) Reprint permit | | | 7/25/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/10/2006 | | 7/24/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 7/10/2006 | | 7/24/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2006 | | |
|
|
|
lft vm with jeff ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/24/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 7/20/2006 | 7/20/2006 | 7/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Witnessed the secondary water supply tank sitting in the hole in the ground and inspected piping about hard lids. I marked locations on plans.
|
INSP-Sprinkler Rough-in | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | PASS |
Troy Cobbley
|
|
|
The piping above the hardlids as marked on the 2nd and 3rd floor plans is ok to cover.
|
INSP-Sprinkler Rough-in | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Troy Cobbley
|
|
|
The 8" city supply underground for the project is ok to cover. The two 8" elbows did not need to be installed.
|
INSP-Sprinkler Rough-in | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler hangers located in the mechanical penthouse of the north tower are ok to cover with fire proofing.
|
INSP-Supply line flush | 6/29/2006 | 6/29/2006 | 6/29/2006 | P | PART |
Troy Cobbley
|
|
|
Inspection was not for a flush but for a partial cover inspection of the underground. One length of underground piping as installed is ok to cover. It extends from the existing tap to the base of the column.
|
INSP-Conference | 6/27/2006 | 6/27/2006 | 6/28/2006 | P | DONE |
Troy Cobbley
|
|
|
Request was for pendant heads only to be installed below a retardant treated wood slat ceiling in the elevator lobbies. This request has been approved upon review of Bill Alexander and the building plan reviewer. I conveyed this message to the field installer.
|
INSP-Sprinkler Rough-in | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
west half of the 2nd floor rough-in is passed. Inspection for arm-overs will need to be done.
|
INSP-Sprinkler Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | PASS |
Troy Cobbley
|
|
|
Third floor sprinkler piping, except areas as marked on the plans, rough-in inspection has passed. Will need to be reinspected for hangers on arm overs prior to cover up.
|
INSP-Sprinkler Rough-in | 6/5/2006 | 6/5/2006 | 6/6/2006 | P | CANC |
Troy Cobbley
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
INSP-Sprinkler Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled
|
INSP-Sprinkler Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PASS |
Troy Cobbley
|
|
|
The east half of the tower basement rough-in passed. Also the standpipe passed. Some piping has not been installed yet and is marked as such on the plans. Ceiling have not been installed which means arm overs will need to be inspected prior to coverup.
|
Issue and Print Permit | | | 5/16/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/16/2006 | | 5/16/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/22/2006 | | 5/16/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 5/11/2006 | | 5/16/2006 | | PASS |
Bill Alexander
|
|
|
The 6th, 7th, 9th, 10th floors.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/16/2006 | | 5/16/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/16/2006 | | |
|
|
|
|
Telephone call | | | 5/16/2006 | | DONE |
|
|
|
lft vm with greg johnson ###-#### that permit and fees are ready to be picked up
|
INSP-Sprinkler Rough-in | 5/15/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Troy Cobbley
|
|
|
Inspection was for the basement of the new tower. Area inspected today was the west half of the basement. Some minor items have been found. See approved plans for locations.the east half of the system and all of the 6" standpiping needs inspected.
|
Plan resubmittals received | | | 5/10/2006 | | |
|
|
|
|
Case Summary | | | 5/10/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Troy Cobbley
|
|
|
Hangers on third floor connecting corridor are ok.
|
INSP-Sprinkler Rough-in | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Troy Cobbley
|
|
|
See city approved plans for exact locations approved for rough-in and locations of corrections. Hangers on end lines need to have hangers prevent the upward movement of the sprinkler piping due to pressures in excess of 100psi. Also plans need to be resubmitted with corrections per the review comments.
|
Sprinkler Plan Check | 2/22/2006 | | 3/17/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/17/2006 | | |
|
|
|
|
Telephone call | | | 3/17/2006 | | |
|
|
|
Informed Greg Johnson (Treasure Valley Fire Protection) ###-#### to pick up permit 3-17-06 eus
|
Inspection Record Card- Fire | 3/17/2006 | | 3/17/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/17/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/22/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/3/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 12/30/2005 | | 12/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Sprinkler Plan Check | 12/8/2005 | | 12/29/2005 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 12/8/2005 | | 12/29/2005 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2005 | | DONE |
|
|
|
|
FIR-Aging Inspection | 12/9/2005 | 12/9/2005 | 12/12/2005 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
Plan resubmittals received | | | 12/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/4/2005 | | 11/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/22/2005 | | 10/12/2005 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 10/12/2005 | | DONE |
|
|
|
Took revised approved plans to the permit desk for issueing.
|
Permit Ready to Issue | | | 10/12/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/12/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/12/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/22/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/9/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/9/2005 | | 9/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2005 | | DONE |
|
|
|
Spoke with Greg and told him that permit is ready & fees///9/9/05 11:05am BAS
|
Issue permit | | | 9/9/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/22/2005 | | 9/8/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/22/2005 | | 9/8/2005 | | PART |
Bill Alexander
|
|
|
Reference requiements per attached review comments list.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2005 | | DONE |
|
|
|
|
Application received | | | 8/22/2005 | | |
|
|
|
|