INSP-Final Inspection | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | FAIL |
Troy Cobbley
|
|
|
Left message on Jims phone. No body at job site.
|
INSP-Final Inspection | 10/27/2005 | 10/27/2005 | 10/27/2005 | P | FAIL |
Troy Cobbley
|
|
|
backflow preventor surges, provide additional heads for the spare head box, provide test papers, provide verification that the heads can remain.
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PART |
Troy Cobbley
|
|
|
Underground hydro passed. Sprinkler rough-in passed except that the wrong upright sprinkler heads have beem installed. If heads remain resubmittals will be required and the overhead hydro will be passed. If the heads are changed out to the VK200's as per plan then the hydro needs redone.
|
Issue permit | | | 9/15/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/30/2005 | | 9/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/30/2005 | | 9/14/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/14/2005 | | 9/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2005 | | DONE |
|
|
|
Spoke with Lindsey and told her that permit is ready & fees///9/14/05 3:52pm BAS
|
Application received | | | 8/30/2005 | | |
|
|
|
|