Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00559
StatusVoid/No Violation
Name AIC SOLUTIONS INC
Site Address 251 E FRONT ST Unit: 300
Project Namealm - ONE FRONT ST-3RD FLR
Customer Number 
ePlanReview 
Description
To provide total notification in the TI space being added to existing tenant, located on the 3rd floor. The required manual fire alarm system includes sprinkler monitoring, elevator recall/shutdown, HVAC shutdown and notification throughout.

10/14/2005 - Revised matrix indicate the duct detectors shall be alarm to match existing in the balding. The PDS Fire Inspector shall field verify.

The associated building permit (BLD 05-01899) is to expand an existing 11,850 sq.ft. office another 2,603 sq.ft. in a new shell building per approved plans. Work to include, construction of interior noncombustible partitions, installation of suspended ceiling system with related lighting and miscellaneous related interior finishes. This building is fully fire sprinklered any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. A New Certificate of Occupancy will be required to include the additional area. Rmh (ELAM & BURKE)(ONE FRONT STREET-3RD FLR)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit VOIDED11/18/200511/18/200511/18/2005 DONE
Per Forest this company did not complete the work
INSP-Final Inspection10/25/200510/25/200510/25/2005PFAIL
DetailsTroy Cobbley
Strobes are not synced, end of line voltage did not meet the 21.6 required (was 18.012), need to retest the east duct smoke detector since it did not want to latch when first tested and need updated map at the facp
INSP-Final Inspection10/21/200510/24/200510/24/2005PFAIL
DetailsForrest France
Orientation and length of the sample tubes in the ductwork are not correctly installed, activation of the duct smoke detector produced a weak intermittent alarm signal reading 4.5 at the EOL under battery power.
INSP-Final Inspection10/19/200510/21/200510/21/2005PCANC
DetailsForrest France
No time available for this inspection today, spoke with Kelly to reschedule for monday 10/24 per our agreement.
Inspection Record Card- Fire10/17/2005 10/17/2005 DONE
Permit Ready to Issue  10/17/2005 DONE
Telephone call  10/17/2005 DONE
called ###-#### and told Samuel that permit is ready
CHANGE STATUS TO (ISS)  10/17/2005 DONE
already issued previously
Alarm Plan Check  10/14/2005 PASS
Plan Modification. Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  10/14/2005 DONE
Plan resubmittals received  10/7/2005 DONE
Case Summary  10/7/2005 DONE
Issue and Print Permit  9/28/2005 DONE
Plan assigned to (Mary)8/31/2005 9/23/2005 DONE
Alarm Plan Check  9/23/2005 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  9/23/2005 DONE
Permit Ready to Issue  9/23/2005 DONE
Inspection Record Card- Fire9/23/2005 9/23/2005 DONE
Telephone call  9/23/2005 DONE
Spoke with Sammy and told him that permit is ready & fees///9/23/05 12:10pm BAS
Plan resubmittals received  9/14/2005 DONE
Alarm Plan Check  9/8/2005 FAIL
Resubmittal required. Faxed comments to Samuel Flores.
Application received  8/31/2005  
Case Summary  8/31/2005 DONE